Skip to main content

Indonesia’s improved airport benefits from new runway

A new runway surface has been constructed at Yogyakarta International Airport in Indonesia.
September 19, 2019 Read time: 1 min
Slipforming machines from Wirtgen have been used to pave the runway, taxiways and aircraft parking facilities at Indonesia’s Yogyakarta International Airport

This airport has been developed to replace Adisutjipto International Airport of Yogyakarta, which is no longer able to meet capacity demands. The runway has been in use since the beginning of May 2019, when the first aircraft landed on the new runway.

Construction of this new airport is being carried out in two phases and the facility will cover a site of 645ha and be able to handle up to 15 million passengers/year when it is fully commissioned.

Concrete paving equipment from 2395 Wirtgen has been used to pave the main runway, the taxiways and aircraft parking areas. In all, 11 slipform pavers from Wirtgen have been used at the airport. The completed runway measures 3.25km in length and is 45m wide.

 

For more information on companies in this article

Related Content

  • Technology helps earth moving and paving
    August 18, 2014
    Located in Meeker, Colorado and serving the area for air transportation is Meeker Airport, a C-II general aviation airport. The FAA designation of C-II means the airport can accommodate aircraft with wingspan of less than 24m. Runway 3-21 at the Rio Blanco county-owned Meeker Airport had reached a point of wear and deterioration that required full reconstruction and upgrades to remain compliant with the FAA’s C-II requirements.
  • Concrete pavers improve major highway upgrade
    July 13, 2012
    In Brazil, concrete pavers from Wirtgen are being used to improve sections of the BR-101 highway as well as to construct concrete safety barriers. The use of these machines is of note as it is the first time concrete paving has been used on a federal road in Brazil. The 1st Army Engineering Division of the Brazilian Army is carrying out three of the eight North Eastern sections, as the construction work had to be speeded up project because the road is deemed crucial to the country's economy. Two Wirtgen SP8
  • Runway rebuild with Caterpillar machines
    February 2, 2017
    Kilgore Contracting has used Caterpillar machines to repave a runway at the Provo Utah Municipal Airport.
  • Wirtgen Group machines delivering new runway for German airbase
    October 26, 2016
    Machines from the Wirtgen Group are carrying out an important reconstruction job for the surface course at Büchel Air Base. Road machinery from Hamm, Vögele and Wirtgen as well as asphalt plants from Benninghoven have been carrying out the work, delivering a new runway within a tight timeframe. To achieve this, the work had to be planned well in advance, with the contractors organising the logistics and their personnel accordingly.