Skip to main content

Icelandic road duty for an FAE MTL 225 milling unit

In the northwest of Iceland, a local company is using equipment from Italian specialist supplier FAE to help recycle roads. The country’s climate is tough on its road network, with repairs being needed on a regular basis.
November 26, 2019 Read time: 2 mins
The FAE MTL 225 is used to repair and maintain the 1,300km of Highway 1

Icelandic firm Vegagerdin is responsible for maintaining all of Iceland’s roads. The company has brought in local contractor Leichus Greta to carry out much of this work, which now has an FAE MTL 225 multi-purpose milling unit in its equipment fleet. The attachment is used to repair and maintain the 1,300km Highway 1, which has an asphalt surface, as well as to stabilise unpaved gravel roads.

The firm used its FAE MTL 225 on the 60-25 road near Reykholar, recycling a section of 20km with about 50mm of asphalt and its subfloors, with stones up to 250mm in diameter. The MTL 225s are said to have proven to be successful because they offer optimum performance on both unpaved and asphalted roads.

The MTL was developed for customers who own 104-179kW tractors and need solutions for soil stabilisation, rock slab grinding, stone crushing, and asphalt shredding at a maximum depth of 280mm. Internal frame guards are secured with screws both centrally and on the sides to ensure the machine is both robust and reliable.

The variable geometry system, adjustable grid on rear door, and an adjustable Hardox counter-blade, allows the grinding chamber to adapt to the needs of a job. The depth gauge has been redesigned to help operators efficiently monitor depth along with an in-height adjustable gearbox to make adjustment, regardless of the size of the tractor and the operating angle.

For more information on companies in this article

Related Content

  • Success of hot mix asphalt road recycling
    March 7, 2012
    Russian construction firm Kamdorstroy has carried out a successful demonstration of recycling techniques to over 60 highway officials, academics and contractors from all over the CIS states. The demonstration was carried out in co-operation with the Russian Federal Highway and Tatarstan Highway authorities and involved milling, recycling and overlaying a road with hot mix asphalt. The work was carried out on a 7.5m wide roadway with 3.8m wide lanes (with an overlap) using machinery and techniques new to Rus
  • Crushing and screening advances introduced
    June 10, 2019
    New developments in crushing and screening equipment as well as washing technology will deliver benefits for materials production - Mike Woof writes Competition is tough in the market for quarry material processing equipment, with key firms introducing new systems that are said to boost capacity and performance. Firms offering crushing and screening equipment have expanded their respective ranges, offering additional capabilities for these segments. Mobility and versatility have been key factors in the d
  • FAE’s RCU-75 tracked carrier comes with remote control and powerful 2.4 GHz comms
    March 16, 2023
    FAE’s latest tracked carrier, the sleek and powerful RCU-75, is guided by an ergonomic remote control with a large 89mm display panel for controlling all of the vehicle and attachment functions and with customisable function keys. A 2.4 GHz transmission frequency ensures reliable communication.
  • Rainforest road construction challenge in Malaysia
    October 3, 2014
    Working in a rainforest area can be challenging, but in a rural area outside of Kuching in East Malaysia, a road construction crew was able to carry out a project successfully One of the biggest challenges came from the moisture levels as the area has an average annual rainfall of 4200mm. The saturated soil complicates the construction process on many levels, including stabilisation and compaction. However this heavy moisture content in the soil is a constant for Geocrete Specialist crews, which handl