Skip to main content

Faster stabilisation

Improved performance is claimed for Roadtec's SX-7 soil stabiliser which now offers increased visibility for the operator. The cab is optional and can now be slid from side to side past the frame of the machine, allowing the operator to observe the working area. The front and rear of the machine have also been reworked to add to the visibility improvements.
February 7, 2012 Read time: 2 mins
Upgrades improve operator visibility for Roadtec's SX-7 stabiliser
Improved performance is claimed for 1252 Roadtec's SX-7 soil stabiliser which now offers increased visibility for the operator. The cab is optional and can now be slid from side to side past the frame of the machine, allowing the operator to observe the working area. The front and rear of the machine have also been reworked to add to the visibility improvements.

For the SX-7, water and emulsion are handled by a single system and any single nozzle, or set of nozzles in the spray bar can be turned off individually to control how much liquid material is put down. The machine has a new central control and diagnostic package with a screen that gives the operator feedback on every function of the machine. The variable volume cutter allows the drum to be moved up or down in the housing during operation. Maximum cut depth of the SX-7 is 530mm and standard cutting width is 2.57m and other features such as the narrow turning circle and service accessibility have been retained.

For more information on companies in this article

Related Content

  • On track for excellence in asphalt plants
    May 30, 2013
    While one leading asphalt plant company has played a key role in the creation of the new Circuit of the Americas F1 racetrack, others have been releasing new plants and plant-related technology onto the market, some of which has been exhibited at major world industry shows. Guy Woodford reports. Astec played an important role in the new Circuit of the Americas Formula 1 racetrack in Austin, Texas. The asphalt base, binder, and surface courses for the 5.47km asphalt road course, which staged its first F1 rac
  • Volvo machines help construct new Norwegian tunnels
    January 12, 2015
    Close to Larvik in Norway’s Vestfold County and around 80km south of Drammen, two tunnels are currently under construction as part of a state-funded infrastructure development programme. The project, which began earlier this year, comprises 7km of four lane highway – part of the E18 major route – linking the towns of Bommestad and Sky. This includes the new Larvik and Matineå tunnels, which will span 2.8 and 1.3km respectively. Worth €187 million, this project was awarded to Skanska Norway, the second la
  • New drilling and blasting technology aids efficient quarrying
    April 13, 2012
    Innovations in drilling and blasting and crushing and screening are bringing major economies of scale to aggregate production operations. Drilling and blasting is an area where new technology is offering major saving to quarrying companies. This is another important factor in the quarrying process, as inefficient drilling and blasting can have major financial repercussions.
  • New drilling and blasting technology aids efficient quarrying
    March 15, 2012
    Innovations in drilling and blasting and crushing and screening are bringing major economies of scale to aggregate production operations. Drilling and blasting is an area where new technology is offering major saving to quarrying companies. This is another important factor in the quarrying process, as inefficient drilling and blasting can have major financial repercussions.