Skip to main content

Cost-effective and efficient concrete recycling

Liebherr claims its three-size LRT 622 trough system recycling plants provide cost-effective and efficient separation and recycling of pre-hardened concrete components from batching plants and truck mixers.
March 15, 2012 Read time: 1 min
Liebherr says its LRT 622 provides efficient and cost-effective concrete recycling
718 Liebherr claims its three-size LRT 622 trough system recycling plants provide cost-effective and efficient separation and recycling of pre-hardened concrete components from batching plants and truck mixers.

Process water from each recycling plant, collected in a sump tank and suspended by an agitator, is returned to the production plant. Sand and gravel is then washed clean ready for re-use as production aggregates.

The trough pattern on the LRT 622 holds a high amount of wash water so that larger quantities of material for recycling can be added at shorter intervals.

A sizeable loading hopper can be filled from virtually any angle and can contain up to two truck mixers at any one time.

The LRT 622 Concrete Recycling Plant has a trough length of 6000mm; a trough diameter of 2200mm; a solids discharge height of 2000mm; a drive motor rating of 11kW; and a throughput capacity of up to 20m³ per hour.

For more information on companies in this article

Related Content

  • Roadtec changes the game of asphalt paving
    December 20, 2016
    Truly innovative is Roadtec’s Shuttle Buggy material transfer vehicle. John Irvine, President of Roadtec, explains how and why the ‘Buggy’ changed the game of asphalt paving Road paving technology changed dramatically in the 1930s when the American inventor Harry Barber unveiled the very first asphalt paver. Barber was what we today would call a “game-changer”. Innovations like Barber’s don’t come around often. In fact, decades can pass until another breakthrough product pushes the productivity and q
  • Asphalt plant innovations from key firms
    June 12, 2017
    Asphalt plant builders continue to develop new technologies to meet different demands from clients. Marini says that in addition to developing new and more sophisticated asphalt plants, the firm is also meeting demands from customers looking to upgrade existing asphalt plants with the addition of new systems. These can be used to boost output and material quality, while also delivering new grades of mixes. At the same time, plant upgrades can reduce the environmental profile of a plant, while improving its
  • Maximising cone crusher efficiency
    September 30, 2013
    Ensuring efficient cone crusher operation can deliver major economies of scale for quarrying facilities There are a number of ways in which cone crusher throughput can be optimised. One of the key issues is in keeping the system choke fed during operation, as this maximises the effectiveness of rock-on-rock crushing, extends the wear life of manganese components and ensures a quality product shape. A lack of feed causes inconstant loading, which affects the long-term life of internal components.
  • JCB excavators and Terex Washing Systems’ plant at work in the Caribbean region
    June 24, 2013
    Excavators and a wash plant have been supplied for work in the Caribbean region. New equipment has been delivered to companies for projects in the countries in the Caribbean. A fleet of eight 20tonne JCB JS200 crawler excavators has been bought by a construction company and put to work in one of the biggest ever highway projects in the Caribbean, while DUO, a Terex Washing Systems’ global distributor, has installed a custom-built Terex sand and gravel wash plant at the Readymix West Indies (W.I.) site in Va