Skip to main content

Cost-effective and efficient concrete recycling

Liebherr claims its three-size LRT 622 trough system recycling plants provide cost-effective and efficient separation and recycling of pre-hardened concrete components from batching plants and truck mixers.
March 15, 2012 Read time: 1 min
Liebherr says its LRT 622 provides efficient and cost-effective concrete recycling
718 Liebherr claims its three-size LRT 622 trough system recycling plants provide cost-effective and efficient separation and recycling of pre-hardened concrete components from batching plants and truck mixers.

Process water from each recycling plant, collected in a sump tank and suspended by an agitator, is returned to the production plant. Sand and gravel is then washed clean ready for re-use as production aggregates.

The trough pattern on the LRT 622 holds a high amount of wash water so that larger quantities of material for recycling can be added at shorter intervals.

A sizeable loading hopper can be filled from virtually any angle and can contain up to two truck mixers at any one time.

The LRT 622 Concrete Recycling Plant has a trough length of 6000mm; a trough diameter of 2200mm; a solids discharge height of 2000mm; a drive motor rating of 11kW; and a throughput capacity of up to 20m³ per hour.

For more information on companies in this article

Related Content

  • Eight Tips to Getting the Most ROI from Your Sealcoating Equipment
    August 29, 2019
    Maximizing return on investment doesn’t take a mathematician.
  • Cost-effective cold mix asphalt recycling
    February 17, 2012
    In Lithuania, cold mix asphalt containing recycled asphalt pavement has been installed in a new base course overlay for a section of the A1, the country's most heavily trafficked motorway.
  • Crushing system boosts quality sand production
    February 16, 2012
    A new VSI crushing system is helping Tarmac boost sand production at a key quarry in the UK. Manufactured sand is now being produced at the Tarmac Blashford quarry where a new VSI from Sandvik Mining and Construction is delivering product of high quality, specifically sized and shaped for construction purposes.
  • Multiple asphalt plants supply major highway construction
    July 12, 2012
    One company has produced eight asphalt plants for a major project, and others are introducing new models as Patrick Smith reports Algeria's US$11.2 billion East-West Highway development, the world's largest current highway construction project, forms part of the larger Trans-Maghreb Motorway project, and is scheduled for completion in 2010. It will run for 1,216km, ensuring the link between Annaba in the north-east and Tlemcen in the north-west, passing directly through 24 provinces and linking Algeria to T