Skip to main content

Compact planer under test

BOMAG has carried out a successful series of demonstrations of its new BM500/15 compact milling machines in Berlin. The machine was tested at the Representative Offices of Rheinland-Palatinate to the Federal Government and the European Union in Berlin and for the first time the planer carried out practical tests in the grounds of the company's Berlin Branch. A total of around 100 guests watched a highly convincing demonstration. After a reception at the Representative Offices of Rheinland-Palatinate delegat
February 22, 2012 Read time: 3 mins
172 Bomag has carried out a successful series of demonstrations of its new BM500/15 compact milling machines in Berlin. The machine was tested at the Representative Offices of Rheinland-Palatinate to the Federal Government and the 1116 European Union in Berlin and for the first time the planer carried out practical tests in the grounds of the company's Berlin Branch. A total of around 100 guests watched a highly convincing demonstration. After a reception at the Representative Offices of Rheinland-Palatinate delegates saw the machines being run at the company's Berlin Branch.

Nine tests were carried out by the new planer. A defective concrete channel had to be milled on both sides for 500mm in a total of three strips around 40mm deep. The quick-change LA 15 (500mm) milling drum was selected and was able to leave a clean and precise edge and a level surface. The conveyor belt on a compact planer often has to be disconnected for certain work such as to position the rear of the machine close to a wall and the faster this can be achieved, the less downtime for the contractor. The process time including dismounting from the machine, lowering the scraper and setting off again took 2 minutes 30 seconds. Planing a manhole cover is another key task and the machine was able to perform this quickly and efficiently. Changing the drum is also important for versatility and this job took 8 minutes 6 seconds. The disconnected conveyor belt was now reconnected - just as easily and quickly. This ensures that the versatility of this BOMAG planer is fully utilised. This procedure is only carried out on-site if the conveyor belt is easily disconnected and connected, ensuring that hand cutting work in tight spaces is reduced. The sixth task involved the POWER DRUM, a milling drum with 20mm line spacing, to plane out an 80-120mm deep crack in the asphalt and to load the milled material. The next task was to plane a concrete channel, a speciality for the POWER DRUM. With the drum's large line spacing, the individual cutters generate greater cutting power and pulverise the hard concrete. The last two tasks involved examining ease of servicing. Checking the spray bar is said to be particularly easy, just like the other service points. All are easily and quickly accessible on the right side of the machine where everything is in view and nothing gets forgotten.

For more information on companies in this article

Related Content

  • Machine control technology shortens road contract
    May 28, 2013
    The use of sophisticated machine control technology has helped halve the schedule required for a road contract – Jeff Winke. By using the latest machine control systems on the equipment fleet, a US contractor has managed to halve worker hours, machine time and overall costs. “We chopped 50% off the contract schedule,” said Jim Swenson, licensed professional land surveyor for Oregon Mainline Paving based in McMinnville, Oregon. “The project was completed a year ahead of the two-year schedule,” he explained
  • Wirtgen spreads the word about Streumaster
    August 8, 2023
    Streumaster sets the standard for filling, material conveying and spreading accuracy.
  • New line of versatile attachments from Epiroc
    May 22, 2019
    A new line of versatile hydraulic attachment tools is being offered by Epiroc. The firm has added three new ranges: ERC transverse drum cutters with integrated hydraulic rotation; ER-L axial drum cutters; and ADU auger drive units based on Erkat drum cutter technology. With models suitable for carriers in most weight classes, these attachments are said to offer reliability and productivity for a wide range of excavation and demolition tasks. The ER range of transverse drum cutters replaces Epiroc's prov
  • Haver & Boecker customises Tyler T-Class Vibrating Screen
    April 16, 2018
    Haver & Boecker Canada says it now customises to order its two-bearing Tyler T-Class vibrating screen for a wide range of materials with a top size of 406mm minus. The T-Class machine has a cut size range of 20 mesh to 152.5mm minus. It also has a sheave combination and drive belts for power, according the Canadian manufacturer - formerly WS Tyler. Add-on components include a dust enclosure, spray system, ball trays, special paint systems and more. Additionally, Haver & Boecker manufactures the machine with