Skip to main content

Compact planer under test

BOMAG has carried out a successful series of demonstrations of its new BM500/15 compact milling machines in Berlin. The machine was tested at the Representative Offices of Rheinland-Palatinate to the Federal Government and the European Union in Berlin and for the first time the planer carried out practical tests in the grounds of the company's Berlin Branch. A total of around 100 guests watched a highly convincing demonstration. After a reception at the Representative Offices of Rheinland-Palatinate delegat
February 22, 2012 Read time: 3 mins
172 Bomag has carried out a successful series of demonstrations of its new BM500/15 compact milling machines in Berlin. The machine was tested at the Representative Offices of Rheinland-Palatinate to the Federal Government and the 1116 European Union in Berlin and for the first time the planer carried out practical tests in the grounds of the company's Berlin Branch. A total of around 100 guests watched a highly convincing demonstration. After a reception at the Representative Offices of Rheinland-Palatinate delegates saw the machines being run at the company's Berlin Branch.

Nine tests were carried out by the new planer. A defective concrete channel had to be milled on both sides for 500mm in a total of three strips around 40mm deep. The quick-change LA 15 (500mm) milling drum was selected and was able to leave a clean and precise edge and a level surface. The conveyor belt on a compact planer often has to be disconnected for certain work such as to position the rear of the machine close to a wall and the faster this can be achieved, the less downtime for the contractor. The process time including dismounting from the machine, lowering the scraper and setting off again took 2 minutes 30 seconds. Planing a manhole cover is another key task and the machine was able to perform this quickly and efficiently. Changing the drum is also important for versatility and this job took 8 minutes 6 seconds. The disconnected conveyor belt was now reconnected - just as easily and quickly. This ensures that the versatility of this BOMAG planer is fully utilised. This procedure is only carried out on-site if the conveyor belt is easily disconnected and connected, ensuring that hand cutting work in tight spaces is reduced. The sixth task involved the POWER DRUM, a milling drum with 20mm line spacing, to plane out an 80-120mm deep crack in the asphalt and to load the milled material. The next task was to plane a concrete channel, a speciality for the POWER DRUM. With the drum's large line spacing, the individual cutters generate greater cutting power and pulverise the hard concrete. The last two tasks involved examining ease of servicing. Checking the spray bar is said to be particularly easy, just like the other service points. All are easily and quickly accessible on the right side of the machine where everything is in view and nothing gets forgotten.

For more information on companies in this article

Related Content

  • Innovations for asphalt compaction
    June 15, 2012
    Asphalt compaction advances were unveiled from an array of manufacturers at the INTERMAT 2012 event - Mike Woof reports. With new emissions legislation being introduced, manufacturers are rolling out a range of new asphalt compaction models designed to meet the latest requirements. These include both large rollers for high-production highway operations and compact machines designed for the rental market and suited to urban applications, with the latter segment becoming particularly competitive at present.
  • Roadtec changes the game of asphalt paving
    December 20, 2016
    Truly innovative is Roadtec’s Shuttle Buggy material transfer vehicle. John Irvine, President of Roadtec, explains how and why the ‘Buggy’ changed the game of asphalt paving Road paving technology changed dramatically in the 1930s when the American inventor Harry Barber unveiled the very first asphalt paver. Barber was what we today would call a “game-changer”. Innovations like Barber’s don’t come around often. In fact, decades can pass until another breakthrough product pushes the productivity and q
  • Wirtgen’s new compact milling machines
    May 16, 2022
    Wirtgen says that its new class of compact milling machines are cost-efficient and sustainable
  • All aboard the Wirtgen paving train on Germany’s A7 project
    February 21, 2019
    The A7 is being widened between Hamburg and Bordesholm from four lanes to six - in some places to eight - to ensure the motorway remains an efficient traffic artery. The aim is to create a pavement with a high degree of driving comfort but which withstands the loads of heavy-goods traffic. For widening the 60km stretch in the Schleswig-Holstein region, consortium Via Solutions Nord and joint venture ARGE A7 Hamburg-Bordesholm opted for steel reinforced concrete paving with an exposed aggregate concrete s