Skip to main content

Compact planer under test

BOMAG has carried out a successful series of demonstrations of its new BM500/15 compact milling machines in Berlin. The machine was tested at the Representative Offices of Rheinland-Palatinate to the Federal Government and the European Union in Berlin and for the first time the planer carried out practical tests in the grounds of the company's Berlin Branch. A total of around 100 guests watched a highly convincing demonstration. After a reception at the Representative Offices of Rheinland-Palatinate delegat
February 22, 2012 Read time: 3 mins
172 Bomag has carried out a successful series of demonstrations of its new BM500/15 compact milling machines in Berlin. The machine was tested at the Representative Offices of Rheinland-Palatinate to the Federal Government and the 1116 European Union in Berlin and for the first time the planer carried out practical tests in the grounds of the company's Berlin Branch. A total of around 100 guests watched a highly convincing demonstration. After a reception at the Representative Offices of Rheinland-Palatinate delegates saw the machines being run at the company's Berlin Branch.

Nine tests were carried out by the new planer. A defective concrete channel had to be milled on both sides for 500mm in a total of three strips around 40mm deep. The quick-change LA 15 (500mm) milling drum was selected and was able to leave a clean and precise edge and a level surface. The conveyor belt on a compact planer often has to be disconnected for certain work such as to position the rear of the machine close to a wall and the faster this can be achieved, the less downtime for the contractor. The process time including dismounting from the machine, lowering the scraper and setting off again took 2 minutes 30 seconds. Planing a manhole cover is another key task and the machine was able to perform this quickly and efficiently. Changing the drum is also important for versatility and this job took 8 minutes 6 seconds. The disconnected conveyor belt was now reconnected - just as easily and quickly. This ensures that the versatility of this BOMAG planer is fully utilised. This procedure is only carried out on-site if the conveyor belt is easily disconnected and connected, ensuring that hand cutting work in tight spaces is reduced. The sixth task involved the POWER DRUM, a milling drum with 20mm line spacing, to plane out an 80-120mm deep crack in the asphalt and to load the milled material. The next task was to plane a concrete channel, a speciality for the POWER DRUM. With the drum's large line spacing, the individual cutters generate greater cutting power and pulverise the hard concrete. The last two tasks involved examining ease of servicing. Checking the spray bar is said to be particularly easy, just like the other service points. All are easily and quickly accessible on the right side of the machine where everything is in view and nothing gets forgotten.

For more information on companies in this article

Related Content

  • Powerful reclaimer/stabiliser aids road upgrade
    March 15, 2012
    A US contractor is upgrading rural Pennsylvania roads with the aid of a powerful new reclaimer/stabiliser Much of the United States highway infrastructure continues to deteriorate due to lack of a comprehensive road bill and eroding investment in the nation’s roads. However, some of the country’s secondary and rural roads are being upgraded, and funding is coming from unlikely private sources. Energy companies with stakes in the Marcellus and Utica deep shale gas reserve development are working with local
  • An array of crushing and screening innovations was presented at the recent INTERMAT 2012 exhibition
    July 19, 2012
    The crushing and screening phase is a crucial component in aggregate production and new development will help optimise performance - Mike Woof reports Crushing and screening is a key part of the quarrying cycle and has a huge impact on overall operating performance. Optimising operations will cut running costs, reduce materials wastage and also provide a more consistent product quality, boosting cost-effectiveness dramatically. An array of innovations were revealed to the market at the recent INTERMAT 2012
  • Costa Rica concrete repairs
    February 15, 2012
    Work has started on the long awaited San Jose-Caldera Highway in Costa Rica, following numerous delays and setbacks. The new 77.5km highway will be used daily by more than 81,000 vehicles, reducing the travel time between the Central Valley and the Central Pacific Coast by at least 30 minutes.
  • Major upgrade for Chicago O’Hare Airport
    August 14, 2015
    Internationally, airports are being upgraded and expanded to increase capacity and safety – Mike Woof writes. All around the world, airports are being expanded and upgraded, both to cope with massive increases in passenger numbers and also to handle larger aircraft. Runways have to be rebuilt with stronger structures and surfaces to handle greater air traffic volumes as well as increased loads from larger aeroplanes. Building airport runways, however, poses many challenges for construction crews. Paving qua