Skip to main content

Compact planer under test

BOMAG has carried out a successful series of demonstrations of its new BM500/15 compact milling machines in Berlin. The machine was tested at the Representative Offices of Rheinland-Palatinate to the Federal Government and the European Union in Berlin and for the first time the planer carried out practical tests in the grounds of the company's Berlin Branch. A total of around 100 guests watched a highly convincing demonstration. After a reception at the Representative Offices of Rheinland-Palatinate delegat
February 22, 2012 Read time: 3 mins
172 Bomag has carried out a successful series of demonstrations of its new BM500/15 compact milling machines in Berlin. The machine was tested at the Representative Offices of Rheinland-Palatinate to the Federal Government and the 1116 European Union in Berlin and for the first time the planer carried out practical tests in the grounds of the company's Berlin Branch. A total of around 100 guests watched a highly convincing demonstration. After a reception at the Representative Offices of Rheinland-Palatinate delegates saw the machines being run at the company's Berlin Branch.

Nine tests were carried out by the new planer. A defective concrete channel had to be milled on both sides for 500mm in a total of three strips around 40mm deep. The quick-change LA 15 (500mm) milling drum was selected and was able to leave a clean and precise edge and a level surface. The conveyor belt on a compact planer often has to be disconnected for certain work such as to position the rear of the machine close to a wall and the faster this can be achieved, the less downtime for the contractor. The process time including dismounting from the machine, lowering the scraper and setting off again took 2 minutes 30 seconds. Planing a manhole cover is another key task and the machine was able to perform this quickly and efficiently. Changing the drum is also important for versatility and this job took 8 minutes 6 seconds. The disconnected conveyor belt was now reconnected - just as easily and quickly. This ensures that the versatility of this BOMAG planer is fully utilised. This procedure is only carried out on-site if the conveyor belt is easily disconnected and connected, ensuring that hand cutting work in tight spaces is reduced. The sixth task involved the POWER DRUM, a milling drum with 20mm line spacing, to plane out an 80-120mm deep crack in the asphalt and to load the milled material. The next task was to plane a concrete channel, a speciality for the POWER DRUM. With the drum's large line spacing, the individual cutters generate greater cutting power and pulverise the hard concrete. The last two tasks involved examining ease of servicing. Checking the spray bar is said to be particularly easy, just like the other service points. All are easily and quickly accessible on the right side of the machine where everything is in view and nothing gets forgotten.

For more information on companies in this article

Related Content

  • Tunnelling challenge on German project
    June 13, 2012
    A massive construction project has been underway deep in the heart of the Schnecktal valley area in Germany. From the surface, though, you would never be able to tell. The majority of the work is underground, as a joint-venture team led by German contractor Wayss and Freytag Ingenieurbau builds the nearly 7km long Finne Tunnel. After a few years of tunnel boring operations, the contractor is at work finishing the interior of the tunnel, slipforming first the tunnel’s floor and then a walkway with its GOMACO
  • New milling technology from leading players
    February 9, 2018
    Two major manufacturers, Caterpillar and Wirtgen, are introducing new milling machines. Both firms say that these new, high-production units will offer increased output compared with earlier generation equipment. From Caterpillar come the new PM820, PM822 and PM825 machines, which are half-lane milling machines able to handle full-depth removal of asphalt and concrete pavements in a single pass. The firm claims that these units are highly productive and highly manoeuvrable. In operation the machines weig
  • Sophisticated milling system from Wirtgen
    January 29, 2014
    Wirtgen is now offering a novel cold milling concept in the shape of its innovative W 200 Hi model. This large milling machine features a hydraulically driven milling drum assembly that can be displaced 400mm to both the right and the left, ensuring maximum versatility on the job. This machine has been developed to meet the needs of contractors having to work in the confined conditions encountered in urban traffic and on highway sites with flowing traffic. The moveable drum allows this large planer to carry
  • Productive milling on Japanese highway
    February 27, 2019
    A large milling machine from Wirtgen has been used to remove the top two asphalt layers of a key route in Japan in the city of Mito, around 140km north-east of Tokyo