Skip to main content

Asphalt milling machine gives a fine finish

High micro-milling results are said to be achievable using the new cutter from Roadtec. This product has been developed to meet the growing demand for thinner friction courses, which require proper surface preparation. Delamination of thin courses can occur when surfaces are prepared with conventional milling equipment, according to Roadtec. The firm adds that water can get trapped in the recesses of a conventionally milled surface, leading to premature pavement failure.
March 20, 2012 Read time: 2 mins
Fine milling finish can be achieved using the new cutting system from Roadtec
High micro-milling results are said to be achievable using the new cutter from 1252 Roadtec.

This product has been developed to meet the growing demand for thinner friction courses, which require proper surface preparation. Delamination of thin courses can occur when surfaces are prepared with conventional milling equipment, according to Roadtec. The firm adds that water can get trapped in the recesses of a conventionally milled surface, leading to premature pavement failure.

In thin overlay applications micro-milling is required for good results, so Roadtec developed this cutter, which is able to produce a fine, straight-line pattern and does not deviate with changes in travel speed or machine stops for truck changes. Tests of the surface have shown good results, while the milled surface texture is said to be safe for cars and motorcycles when opened to traffic before paving begins. Roadtec says tooth consumption is also low with its new cutter, and, on a recent job consisting of 8km of roadway (16 lane km), 25.4mm removal with a micro finish, no teeth were changed during the five-day project.

For more information on companies in this article

Related Content

  • Cost-saving benefits of dual layer asphalt paving
    February 14, 2012
    Sophisticated dual layer paving technologies currently on the market are said to offer major advantages to road builders. Roads built using twin layer, hot on hot paving techniques can last considerably longer than those constructed using conventional methods. Contractors and clients also stand to gain from savings on materials costs, through the elimination of the need for emulsion spraying between binder and wearing courses and with the use of thin layer wearing course designs. At present two paver man
  • Roadtec bullish with strong results
    February 21, 2017
    Roadtec says that it saw a strong financial performance in 2016 and has high hopes for 2017. Part of Astec Industries, Roadtec says that it finished 2016 exceeding its sales performance goals. The firm says that the asphalt paving market benefited from the passage of the 6-year FAST-ACT Highway Bill on December 4th, 2015. Astec Industries and Roadtec played important roles in an industry-wide campaign calling for US legislators urging them to pass the bill. “Through these efforts and many others in our i
  • Compaction in the field
    July 31, 2012
    Special applications require stringent quality control and with compaction machines a key part of the paving process, their contribution can be vital. A high quality finish has helped athletes breaking sporting records on the track at the Shanghai Stadium in China during this year's 2008 Summer Olympic Games. Built in 1997 the stadium has been the venue for numerous major sporting events prior to the Olympics, however its track was showing signs of wear and the local authorities decided that a full refurbis
  • CRCP is first choice for Belgian highway
    November 28, 2012
    Dan Gilkes reports on a Belgian highway upgrade When the Ministry of Public Works in the Belgian State of Flanders decided to reconstruct and resurface 19km of the N49 Antwerp-Knokke Expressway, continuously reinforced concrete paving (CRCP) with an exposed aggregate surface was the natural material choice. Indeed exposed aggregate, with its high grip and low noise benefits, has been the first option for all motorway surfacing work in Belgium since the 1980s. However, the €15.65 million contract is not a li