Skip to main content

Aquajet's new hybrid hydrodemolition robot

In what it says is a "a world first," Swedish specialist company Aquajet Systems has introduced a new diesel/electric-powered hybrid hydrodemolition robot offering a wide range of new features, including pollution-free operation in enclosed areas in electric-mode.
February 27, 2012 Read time: 2 mins
In what it says is a "a world first," Swedish specialist company 2784 Aquajet Systems has introduced a new diesel/electric-powered hybrid hydrodemolition robot offering a wide range of new features, including pollution-free operation in enclosed areas in electric-mode.

The hybrid systems power pack is powered by a 15 kW engine or a 15 kW electric motor, and simple 'switchover' operation ensures easy change to diesel power.

Featuring an optional extended mast height of up to 9m, the new robot offers larger, adjustable tracks to provide a variable width of between 1.5-2m for increased stability if required.

The hybrid model also incorporates a new type of steering drive to turn and twist the unit's powerhead at the increased heights to provide improved precision.

Aquajet has also developed a multi-axis system allowing the powerhead to be moved quickly, allowing it to work on vertical, curved or horizontal surfaces. The system can also turn the powerhead 180º in the horizontal position.

Additionally, to further speed operation, the robot has been designed to turn through 90º travelling along the wall surface, and this together with the side movement of the powerhead eliminates the constant 'stop-start' turning of the robot.

The robotic units can operate vertically, horizontally and overhead as standard. Attachments allow removal in specialist situations, for example, underneath bridge decks or under water.

According to Aquajet,the hybrid Aquacutter model features an automated control system that optimises settings and applies the minimal force required, allowing the robot to operate selectively, with its high pressured jet of water penetrating into the weak concrete as is passes across the surface.

An innovative intelligent sensing controlled system and a patented high-pressure lance control combine to offer high efficiency and performance.

"The EDS (Equal Distance System) system optimises the angle of attack as well as ensuring the nozzle remains at the correct set distance. This in turn ensures that the optimum 'angle of attack' can be selected, maintaining maximum power from the jet, while keeping the nozzle at the correct set distance from the surface independent from the selected angle of attack.

"The angle can change by as much as +/-30º maximising concrete removal around the reinforcing bars," says Aquajet.

For more information on companies in this article

Related Content

  • Costa Rica concrete repairs
    February 15, 2012
    Work has started on the long awaited San Jose-Caldera Highway in Costa Rica, following numerous delays and setbacks. The new 77.5km highway will be used daily by more than 81,000 vehicles, reducing the travel time between the Central Valley and the Central Pacific Coast by at least 30 minutes.
  • Work on St Petersburg bridge project
    June 20, 2016
    Contractor ICA Construction used two Aquajet robotic hydrodemolition machines at the top of a 120m-high bridge pylon located in the city of St Petersburg. The two Aquajet robotic water cutters were used to remove surplus concrete from around the inner steel structure of the bridge pylon. This link spans the River Neva and forms part of the Western High-Speed Diameter (WHSD) route in St Petersburg. The WHSD is a highly important route for the region and will provide a key connection between the Scandinavi
  • 'Quiet' work in Stockholm
    July 24, 2012
    Aquajet's new Ecosilence Power Pack has been tested to its limits on the tunnel/bridge renovation work in the city's historic Old Town and has exceeded all expectations, according to E-Schakt's project supervisor, Andreas Nordstrom. Equipment from the Swedish company, including Ecosilence making its debut, is being used in the tunnel and on the 1.2km Central Bridge (or 'Three Bridges'), which was built in the 1950s and which links the northern district of Norrmalm and the southern district of Södermalm. It
  • Versatile lance from Auquajet
    February 3, 2020
    The Super Lance 3000 replaces the previous lance and allows contractors to use a single lance for any pressure up to 3,000bar.