Skip to main content

Productive stabilisation

The construction project for an industrial park, which includes building the roads linking to the facility, will benefit from the use of a stabiliser from BoMAG.
April 13, 2012 Read time: 2 mins
The construction project for an industrial park, which includes building the roads linking to the facility, will benefit from the use of a stabiliser from 172 Bomag.

The site is located at Striegistal near Chemnitz in Germany and a new central warehouse facility for Edeka will generate 675 jobs. The ground conditions however required remediation, and the job to provide sound and stable sub-soil was contracted to 3395 MEIER Bodenstabilisierung, based in oelsnitz. The firm has been using BoMAG stabilisers including the new heavy MPh125 unit. MEIER has been using BoMAG machines since 1995 and has wide experience in soil improvement, soil stabilisation, milling, and recycling. This practical experience helped with the development of the BoMAG MPh125 soil stabiliser. The 26tonne machine is driven by a 440kW Deutz diesel, while it features a rotor width of 2.33m.

The unit is also equipped with a water system to provide the correct soil moisture content.

Besides the MPh 125, MEIER has also been using several smaller MPh122-2 stabilisers.

In Striegistal, a total volume of 320,000m³ soil requires improvement, in this case, through the addition of lime. After improvement, the soil features greater load bearing capacity so that new structures with higher loadings can be constructed.

Initially, the planned daily output was 7,500m³ but productivity has been increased and 10,000- 12,000m³ is now being treated/ day. The BoMAG MPh125 mixes in white lime, using an average dosage of 10kg/m² from a spreader. The lime is mixed with natural soil which contains clay with a relatively high moisture content and is checked daily by the Baugrund Sachsen soil laboratory to determine the optimum water content on which to calculate the lime content needed to produce the highest load bearing capability.

For more information on companies in this article

Related Content

  • Asphalt for an airport
    September 12, 2023
    A Lintec CSD2500B containerised asphalt mixing plant is playing a key role for the Yap Island airport rehabilitation project in Micronesia
  • Asphalt resurfacing at Miami International Airport
    February 8, 2012
    Improvements worth US$30 million are being carried out at Miami International Airport. The work includes runway resurfacing with specialist contractors having been brought in to handle the project. This is a busy facility handling some 34 million passengers/year and the work is being carried out over a period of 454 days in all, starting in September 2009 and due to finish in December 2010. The focus of attention is the upgrade to the airport's second longest runway, 8R 26L as well as the adjoining M and N
  • Mexico: underwater tunnel in Latin America
    May 8, 2015
    Mexico will benefit from an important new underwater tunnel - Mauro Nogarin writes. The city of Coatzacoalcos is located at the mouth of the river of the same name, in the Gulf of Mexico, 302km from the city of Salina Cruz, Oaxaca, in the east end of trans-isthmian corridor and at the southern end of Veracruz State. The city is seeing a key development as currently construction is 85% completed on the first immersed tube, underwater tunnel in Latin America. The reasons why experts chose this type of tunne
  • Advanced road recycling systems
    March 15, 2012
    Advanced road recycling capabilities are offered by Wirtgen. Having started as a contractor, Wirtgen’s roots in this side of the business are strong and the company’s development of road recycling systems has become a core competence, originating as an offshoot of its contract work. Wirtgen’s leading position in the milling machine market continues and although an increasing number of rival firms offer machines, the company’s share of this segment remains dominant. With demand for machines having grown in 2