Skip to main content

Tandem solution for Cape Town road

Cape Town's N2 is a strategic South African highway that connects the port city with the country's southwestern region. Due to increasingly heavy traffic on the highway, it was in need of an upgrade, and fast. So one of Cape Town's largest contractors, Vusela, was awarded the government contract to remove the asphalt layers and stabilise the sub-base to strengthen the road's load capacity in preparation for resurfacing.
July 6, 2012 Read time: 3 mins
The Cat PM200 was utilised to remove the existing layers of asphalt, achieving a cutting depth of up to 10cm on one pass
Cape Town's N2 is a strategic South African highway that connects the port city with the country's southwestern region.

Due to increasingly heavy traffic on the highway, it was in need of an upgrade, and fast. So one of Cape Town's largest contractors, Vusela, was awarded the government contract to remove the asphalt layers and stabilise the sub-base to strengthen the road's load capacity in preparation for resurfacing.

In turn Vusela asked 178 Caterpillar to provide a solution: a new Cat PM200 cold planer working in tandem with an RM300 rotary mixer.

Each of the state-of-the-art machines offers a variety of features and productivity, and together they are said to offer a productive and cost effective solution to the road rehabilitation process.

Vusela acquired the machines with the help of Barloworld Equipment, South Africa's Caterpillar dealer for over 80 years. Both machines were the first Caterpillar road construction machine purchases for the contractor, so a commissioning and technical training team was dispatched for three days to get the contractor's operators and crew up and running fast.

According to South African and Near East paving representative and sales manager Johann Hahn, Vusela's operations manager Alan Hendricks has been "very satisfied with machines' performance and the technical support provided by Barloworld and Caterpillar.”

Vusela first utilised the PM200 on the project to remove the existing layers of asphalt, achieving a cutting depth of up to 10cm on one pass. Crews then used the RM300 to reclaim and remix the road's sub-base at a depth of 16cm. A percentage of water was accurately mixed into the processed material through the RM300's water spray option, helping to facilitate the compaction process.

The rotary mixer advanced at a speed of 27m/min throughout the Highway N2 project.

Located on the southeastern tip of Africa on the South Atlantic Ocean Cape Town was established in the mid-1600s as a stopover point along the spice route between the Far East and the Netherlands. Today, South Africa is considered an emerging market with a robust growth rate, and an ample supply of natural resources.

And Hahn sees continuing growth opportunities for the paving sector in South Africa, as its modern infrastructure strives to support the efficient distribution of goods and services throughout this country of 1.2 million m² km.

Barloworld Equipment is the Caterpillar dealer for 11 countries in southern Africa, as well as Siberia, Spain and Portugal, Andorra, Sao Tomé and Principé. It supplies equipment and solutions to customers in the mining, construction, marine, and electrical power generation sectors.

Caterpillar's versatile duo

The Cat RM300 rotary mixer was designed for high performance in both full-depth reclamation and soil stabilisation applications, and is said to deliver these capabilities with proven reliability.

"With its rear wheel drive option, larger rear tyres and universal rotor option, the RM300 is well equipped for even the toughest reclamation jobs, applications that require maximum depth soil stabilisation, high in moisture content such as lime or slurry or other liquid stabilising agents.

"Simplified service and unmatched operator comfort are just a few of its features," says Caterpillar.

"The Cat PM200 Cold Planer combines superior performance and reliability to provide full-depth removal of asphalt and concrete pavements with high productive results."

The PM200's C18 engine with ACERT Technology delivers 429 kW of clean burning power for optimised engine performance. Quick release conical tool holders allow for fast and easy replacement and its high-capacity folding loading conveyor adds versatility and delivers increased jobsite productivity.

For more information on companies in this article

Related Content

  • Meeting engine emission regulations challenges
    February 16, 2012
    New engine emission regulations pose major challenges for engine manufacturers - Geoff Ashcroft reports. The arrival of emissions regulations in January for engines over 130kW has meant that engine makers have adopted varied technologies to meet and exceed those goals. For the end user though, buying new kit that complies with Tier 4 Interim/Stage IIIB emissions regulations is likely to carry additional costs.
  • Lintec asphalt plants for Egypt and the Philippines
    December 1, 2023

    Egyptian firm Rsquared Construction has been using a Lintec CSD2500B asphalt plant to assist with material supply for a road project in the south of the country. The Lintec CSD2500B plant’s first task was to supply material for a short but important road link. The firm, Rsquared Construction, selected the model for its ease of transport and low fuel consumption.

  • Tough competition in concrete paving market
    February 13, 2012
    One thing is clear in the concrete slipforming sector. This comparatively niche market for equipment is rapidly becoming a good deal more competitive as key manufacturers jostle for position.
  • Iowa expects longer lasting road surface
    June 9, 2015
    In the US state of Iowa, tough paving specifications are resulting in contractors delivering road surfaces that will last longer. The Iowa Department of Transportation (I-DOT) expects to see a highway road surface last 20 years and recently let the contract for a 25.7km road resurfacing project for Highway 92 between Winterset and Greenfield. The 40km link between the two towns sees an average 1,365 cars/day travel on the highway, which was last worked on in 1994 and its surface was due for replacement.