Skip to main content

Rebuilding a Chinese highway using RAP

A Chinese contractor has opted to use RAP in delivering quality roadways at lower cost. The firm utilised an ABA UniBatch asphalt plant from Ammann to achieve this. The Chinese authorities are at present keen to increase the use of RAP in road building, in a bid to reduce the environmental impact of construction projects. However for this to be carried out, the high RAP-content mix must meet high quality standards. Shandong Binzhou Road Construction Corp (SBRCC) has carried out a number of high-profil
February 22, 2019 Read time: 3 mins
Using the Ammann plant has allowed the Chinese contractor to use 20% RAP in the feed for its base course during a road rebuild project

A Chinese contractor has opted to use RAP in delivering quality roadways at lower cost. The firm utilised an ABA UniBatch asphalt plant from 6791 Ammann to achieve this.

The Chinese authorities are at present keen to increase the use of RAP in road building, in a bid to reduce the environmental impact of construction projects. However for this to be carried out, the high RAP-content mix must meet high quality standards.

Shandong Binzhou Road Construction Corp (SBRCC) has carried out a number of high-profile highway projects in China recently. These jobs include the repair of G220 and G205 national highways, revitalisation of a section of the Qinbin Expressway and overhaul of the Qingzi Provincial Road.

When SBRCC carried out the rebuild of 50km of China National Highway 220 (G220), which runs from Binzhou to Zhengzhou, the firm decided to utilise RAP in the reconstruction operation. SBRCC was keen to deliver the targets on recycling set by the 2719 Chinese Government.

National and provincial projects in China now have an increased environmental emphasis. For example, the G220 rebuild required the use of 150,000tonnes of asphalt mix with a base layer comprising 25% recycled materials. The ABA UniBatch, which is capable of utilising up to 60% RAP, was able to carry out the task.

SBRCC used the required 25% RAP in the feed for its base mix on the G220 project. The plant produced the mix, with both SBRCC officials and governmental authorities closely checking RAP utilisation and quality.

And according to Lu Shaoli, site manager for SBRCC, the firm also achieved notable fuel savings in the process while using the Ammann ABA UniBatch Asphalt-Mixing Plant.

“Our company attaches great importance to recycling,” said Wei Kehong, deputy director of SBRCC. “Since the beginning of last year, all recycling mix has been tested in detail. All the test data is in full compliance with national and other regulations. The performance of the Ammann plant is consistent and the quality of the mix is guaranteed.”

SBRCC operates a newly upgraded facility, which covers an area of 107,000m2 and includes an array of equipment. “The production site is equipped with an asphalt plant, a stabilised base course mixing plant and a concrete plant,” Shaoli said. “It is a high-standard, modernised, integrated and environmentally friendly comprehensive site. It provides various road materials, recycling materials, prefabrication structural materials and technology research.”

SBRCC closely monitors all phases of the manufacturing process and protects RAP and aggregates. Cold materials are covered and the overflow silo and recycling material buffer are separated. “Our site has passed the Energy Information Administration, which is the benchmark for environmental protection in Binzhou,” Shaoli said.

The plant’s output is also substantial. “The productivity can even exceed 330 tonnes for coarse materials/hour, and the capacity of the mixer can reach up to 4.3tonnes,” Yongbo said.

Production is also said to be cost-effective. “The plant is energy efficient,” Kehong said. “Including the RAP system, the total installed power is only 800kW, which is lower than other comparable plants.”

For more information on companies in this article

Related Content

  • Innovative and sustainable bitumen production
    February 13, 2012
    Innovative and sustainable construction solutions are being tackled by many in the highways industry, including bitumen producers. Patrick Smith reports. Gazprom Neft is one of the largest and fastest growing oil and gas producers in Russia, selling its products to more than 18 Russian regions and exporting them to about 50 countries all over the world.
  • Airport runway rebuild at Bologna
    May 15, 2019
    Rebuilding a runway requires special attention to detail to maximise efficiency and safety Airport runways face special challenges with regard to the loads they carry on a daily basis, particularly when aircraft are landing. A modern jet aircraft will typically land at speeds of around 240-260km/h, with a laden 747 weighing as much as 265tonnes at the end of a long flight. The stresses these large aircraft place on runway surfaces are enormous and not just with the massive impact forces exerted during
  • Global pressures driving bitumen developments
    June 19, 2015
    A raft of global pressures is driving developments in the materials and equipment we use for the handling, storage and treatment of bitumen. The goal is to achieve better performance and longer life for less financial outlay, and at the same time overcome the challenges of inconsistent and varying bitumen supplies. Kristina Smith reports.
  • A breakthrough in the horizontal reuse of PA (porous asphalt)
    May 12, 2016
    An ambitious objective has led to significant steps in the reuse of PA (porous asphalt). While the market incidentally produces PA with a maximum of 30% of recovered raw materials, BAM has introduced its own innovations, enabling more than 90% of raw materials to be reused. And this year, subsidies from the European Commission will enable the LE2AP demonstration project to be constructed: one kilometre of sustainable PA. Large-scale production is also being developed.