Skip to main content

Germany’s B-85 gets the treatment from Bomag’s BM 2200/75 planer

By this spring, Bomag’s new BM 2200/75 cold planer will have removed all the old pavement from a 2.6km section of Germany’s federal highway B-85. Work on the section between Amberg and Pittersberg started at the end of 2016 after the Ministry of Transport classified the road as being in “urgent need” of upgrading as part of the Federal Transport Infrastructure Plan. Actual roadworks began in mid-June 2017 after essential forestry work had been carried out, such as the removal of tree roots on both sides
February 23, 2018 Read time: 3 mins
On this full depth removal job, Bomag’s new BM 2200-75 planer readily handled a variety of material types along the old section of the B-85
By this spring, Bomag’s new BM 2200/75 cold planer will have removed all the old pavement from a 2.6km section of Germany’s federal highway B-85.


Work on the section between Amberg and Pittersberg started at the end of 2016 after the Ministry of Transport classified the road as being in “urgent need” of upgrading as part of the Federal Transport Infrastructure Plan. Actual roadworks began in mid-June 2017 after essential forestry work had been carried out, such as the removal of tree roots on both sides of the road.

The existing road, which will become the Schwandorf-Amberg carriageway, will be given a new pavement this spring. However, before this happens, the old road structure has to be fully removed down to the subsoil.

Fiedler, a contractor from nearby Röhrnbach in the southern Bavarian Forest, has wide expertise in removing concrete and asphalt pavements in layers or, as in the case of the B 85, full-depth removal. Fiedler uses 172 BOMAG equipment including the BM 600/15 and BM 1300/35 cold planers.

Due to the tight construction schedule, full removal had to be completed before the first frosts at the end of 2017. Using a risk-avoidance approach on this €10 million project, the company chose the new BM 2200/75 model with its noted  power and low operating costs, such as less fuel consumption, said Georg Fiedler, company owner.

The complete asphalt removal is carried out in two stages, extending it to 22,000m². Firstly, the surface course was removed with an average thickness of 4cm. In the second milling step, the bearing course was removed with an average layer thickness of 26cm.

Although mixed materials and differing layer thicknesses were found in the course of milling work, the BM 2200/75 readily handled these variable materials and thicknesses extremely well, said Fielding.

Highway contractors depend on easy, straightforward transportation of their equipment from site to site. BOMAG designers came up with a novel solution: the entire milling box with drum is equipped with a quick-change system. The entire milling box can be removed and reinstalled in just 30 minutes. This short set-up and removal time is aided by quick-release hydraulic couplings instead of the usual bolted connections.


“Without a milling box and drum, the weight is below the key 60-tonne limit,” explained Hans Kraft, company managing director. “Even the hydraulically folding conveyor belt that comes as standard helps to reduce transportation issues.”

Fiedler’s BOMAG BM 2200/75 has also been refitted easily and quickly for a range of applications on site and at the contractor’s yard. BOMAG offers a wide range of milling drums, including a standard milling drum, a fine milling drum, and a Powerdrum. Each is available in 2,000mm and 2,200mm widths for milling depths up to 330mm.

Bomaag will be at INTERMAT - International Exhibition for Construction and Infrastructure - in Paris, April 23-28.

For more information on companies in this article

Related Content

  • Recycled asphalt cuts costs, maximises performance
    February 10, 2012
    The need to maximise road performance and cut costs has resulted in Indonesian contractors being keen to adopt cold recycling methods
  • Maputo Airport runway rebuild
    March 26, 2019
    Rebuilding work has been carried out on the runway and taxiways at Maputo International Airport in Mozambique. The work was carried out for Aeroportos de Moçambique, with the engineering handled by NACO and US$64 million of funding being suplied by Agence Française de Dévelopement.
  • Simex RS 16 planer for creating rumble strips
    March 22, 2017
    Simex says that its new RS 16 planer for creating rumble strips is an efficient alternative to costly specially designed machines or small manual equipment Rumble strips created by intermittent milling of the wearing course offer the advantage of lower production costs and a higher durability than those made using elastoplastic adhesives - laminates. Compared to adhesives, rumble strips created by surface milling also have the important advantage of being indented and not raised, a characteristic that av
  • Multiple milling machines removing surface
    April 24, 2019
    Milling subcontractor Pavement Recycling Systems removed thousands of tonnes of reclaimed asphalt pavement (RAP) from a runway at Oakland International Airport in California recently. The firm used a fleet of six Wirtgen W 210i cold milling machines to remove the asphalt in less than 60 hours from Runway 12-30, along the shore of San Francisco Bay. In total, 47,000tons of asphalt were milled within a 60-hour time frame, nonstop day and night, plus a single-shift second phase a week later. The firm start