Skip to main content

Dynapac planer improves racing line

A Dynapac PL350T cold planer helped carry out critical demarcation work on the roads used for the famous Isle of Man's TT motorcycle races. It was used to remove the road markings on the isle in the Irish Sea in readiness for the races. The Dynapac machine is equipped with a special micro milling drum which contains 117 bits, compared to the standard 38, spaced at intervals of 3mm as opposed to the conventional 12mm. In addition, to avoid a sharp edge at the sides of the demarcation area, the drum is slight
July 30, 2012 Read time: 2 mins
A 206 Dynapac PL350T cold planer helped carry out critical demarcation work on the roads used for the famous Isle of Man's TT motorcycle races. It was used to remove the road markings on the isle in the Irish Sea

in readiness for the races. The Dynapac machine is equipped with a special micro milling drum which contains 117 bits, compared to the standard 38, spaced at intervals of 3mm as opposed to the conventional 12mm.

In addition, to avoid a sharp edge at the sides of the demarcation area, the drum is slightly offset by 1 or 2mm at the edges, although very flat across its 300mm surface. This is essential to avoid any danger to the high-speed bikes.

The planer's additional 600kg of ballast on top of the cutter housing ensures the minimum vibration during milling operations and a much smoother and uniform result.

According to the isle's Department of Transport (DOT) maintenance team, other drums with smaller diameters cannot use the standard bit system, which means the Dynapac bits last approximately four times longer than competing drums as they have to use mini-bits.

The machine offers a huge increase in productivity over the previous and labour-intensive method used for line removal with standard blasting equipment.

The TT fortnight attracts around 40,000 visitors/year, takes months to plan, not least by the island's DOT, both in securing the route for bikes, which hit speeds of over 300km/h, and in ensuring the safety of both riders and spectators. House-fronts, walls, lamp-posts and safety barriers are all protected with air fencing and roundabouts are removed along the highly demanding 60km route.

For more information on companies in this article

Related Content

  • Road repairs with recycling for full reconstruction
    July 15, 2015
    Recycling of road surfaces has resulted in restoration and full renovation of a key California route. State Highway 137 in California’s San Joaquin Valley had suffered badly from the effects of weather, traffic and general ageing and the California Department of Transportation recognised the need to improve this route. A 15km section of State Highway 137 west of Tulare, which lies about midway between Fresno and Bakersfield, in the heart of the Central Valley. The road runs through the vineyards and almo
  • Kuwait’s key causeway contract under construction
    July 4, 2016
    A new causeway, crossing the Bay of Kuwait, is under construction and providing a major engineering challenge - Mike Woof reports. The new Sheikh Jaber Al-Ahmad Al-Sabah Causeway Project being built across the Bay of Kuwait is a massive engineering project that is costing around US$3 billion in all. This highly complex project involves the design, build, completion and maintenance of the causeway, which spans Kuwait Bay between Kuwait City and the Subiyah area. The 36km Sheikh Jaber Al-Ahmad Al-Sabah Cau
  • Russian firm uses crane to help bridge building
    May 5, 2015
    Russian construction company BaltMostStroy has been using a Sennebogen 7700 crawler crane to build bridges along a new freeway route The 300tonne capacity crawler crane has been used to lift prefabricated parts weighing as much as 100tonnes onto the concrete foundations. LLC Lonmadi in St Petersburg is Sennebogen’s Russian sales and service partner and supplied the contractor with the 7700 crawler crane. This versatile crawler crane is being used on demanding infrastructure construction work in Russia. A
  • An array of crushing and screening innovations was presented at the recent INTERMAT 2012 exhibition
    July 19, 2012
    The crushing and screening phase is a crucial component in aggregate production and new development will help optimise performance - Mike Woof reports Crushing and screening is a key part of the quarrying cycle and has a huge impact on overall operating performance. Optimising operations will cut running costs, reduce materials wastage and also provide a more consistent product quality, boosting cost-effectiveness dramatically. An array of innovations were revealed to the market at the recent INTERMAT 2012