Skip to main content

Advanced road recycling with Wirtgen

Wirtgen has developed its high-performance W 380 CRi cold recycler to meet requirements for roads requiring structural rehabilitation. This innovative machine is said to highly productive, allowing it to carry out structural road rehabilitation more quickly and with greater cost-effectiveness and quality than previous equipment.
November 4, 2019 Read time: 4 mins
High performance is claimed for Wirtgen’s cold recycling machines

The cold recycling process recycles the surface and base course material and demand for this solution will continue to grow in the future. Using the in-place cold recycling process, the asphalt surface is removed either in full or in layers, depending on the level of damage. This is carried out by a recycling train operating across the entire width of the pavement in a single pass. The milled surface material is mixed with binding agents on site, and then paved again immediately.

The new W 380 CRi from Wirtgen offers working widths of 3.2, 3.5 and 3.8m, the recycler mills the road to depths of 100-300mm for most applications. At the same time, it granulates the material and transforms it into a homogeneous material mixture by adding binding agents such as cement, bitumen emulsion, or foamed bitumen. With a mixing capacity of up to 800tonnes/hour, the cold recycler can feed recycled material to a paver using its swivel-mounted and height-adjustable discharge conveyor at the rear. This makes it possible to complete long stretches of road in a single day of work.

Wirtgen’s tracked recyclers use the down-cut process when recycling, having developed this method, in which the milling and mixing rotor rotates in sync, many years ago. This technique is said to make it possible to vary the particle size of the material being processed, especially in the case of fragile, thin, old asphalt roads.

Roads rehabilitated using the cold recycling process also have to meet the same durability requirements as roads designed and built using conventional methods. With the development of its own laboratory equipment, Wirtgen says it can ensure that rehabilitation measures will be cost-effective and sustainable. As a result, the recycler not only makes it possible to define the ideal composition of the RAP, but also to directly analyse its quality and properties using samples in triaxial and splitting tensile strength tests. The quality of the foamed bitumen can also be defined in the materials laboratory before starting the rehabilitation project.

Cold recycling, particularly with foamed bitumen, is becoming increasingly popular with road authorities and construction companies. In this process, the foamed bitumen is processed in-place with the existing building material. The newly produced bituminous mix is known as bitumen-stabilised material (BSM). After final compaction, it shows a long-term and extremely high load-bearing capacity. From a long-term perspective, BSM allows selective adhesion within the cold recycling layer and prevents cracking. Permanent layers prepared this way form a stable foundation for the final asphalt layer with reduced thickness.

153045
Quality and cost effectiveness are key features of the latest cold-in place road recycling technology

Another advantage of the cold recycling process is the potential for energy savings during material processing. The raw materials do not have to be dried or heated, which means that 10-12litres of fuel can be saved/tonne compared to conventional rehabilitation methods. By reusing the surface course, the need to transport building materials can be reduced by up to 90%. At the same time, companies can cut resource consumption by 90% and eliminate the need to dispose of materials. This results in significantly reduced fuel consumption and lower CO2 emissions. Most importantly, the cold recycling design makes it possible to reduce the use of binders by up to 50%, a significant cost saving.

As the RAP is immediately recycled and the associated logistics are extremely lean, in-place cold recycling means that projects can be completed much quicker than with conventional rehabilitation methods.

The entire series of machines required for the rehabilitation process can fit in the width of just one lane. Meanwhile the recycled pavement can be used after compaction has been completed.

In addition to the Stage 5/Tier 4 Final W 380 CRi and Tier 2 W 380 CR models, the new generation of Wirtgen recyclers also includes the Stage 5/Tier 4 Final W 240 CRi and Tier 2 W 240 CR. The W 240 CRi and W 240 CR recyclers can be equipped with integrated Vögele AB 375 T variable screeds and offer a maximum working width of 2.35m. And the four cold recyclers can also be used as high-performance milling machines employing the up-cut process

 

For more information on companies in this article

Related Content

  • Asphalt plant producers see major worldwide successes
    November 21, 2014
    Asphalt plant manufacturers report major supply deals for highway and construction projects - Pat Smith writes International asphalt plant manufacturers have been reporting major successes with their products, which are now working on highway and airport projects worldwide.
  • Increased use of reclaimed asphalt, reduced emissions
    February 10, 2012
    Reducing emissions and increasing the use of reclaimed asphalt pavement is among the key aims of plant manufacturers. Patrick Smith reports. Lower emissions and the use of recycled materials coupled with reduced costs are the aims of manufacturers of modern asphalt plants.
  • On track for excellence in asphalt plants
    May 30, 2013
    While one leading asphalt plant company has played a key role in the creation of the new Circuit of the Americas F1 racetrack, others have been releasing new plants and plant-related technology onto the market, some of which has been exhibited at major world industry shows. Guy Woodford reports. Astec played an important role in the new Circuit of the Americas Formula 1 racetrack in Austin, Texas. The asphalt base, binder, and surface courses for the 5.47km asphalt road course, which staged its first F1 rac
  • Runway resurfacing in Sardinia with Wirtgen machines
    December 7, 2017
    The fleet used comprised two Wirtgen W 210s and one W 200i, as well as two Wirtgen WR 2000 soil stabilisers. Located roughly 8 km north-west of the city of Alghero, Alghero-Fertilia Airport is one of three commercial airports on the Italian island, along with Cagliari Elmas and Olbia. Built as a military airport in the late 1930s, Alghero-Fertilia still occasionally handles military aircraft. However commercial flights represent its main traffic and as it serves the provinces of Sassari and Oristano, it is