Skip to main content

D-Drill cuts it at 45 degrees with its new machine, D-Kerb

The D-Kerb, a new machine that cuts granite kerbs to 45° without removing them, has just completed several road projects in London. Local authorities and highways maintenance crew no longer have the cost or inconvenience of replacing them completely, said Julie White, managing director of the company D-Drill and also a co-inventor of the D-Kerb machine. During a highways project in Offord Road, North London, technicians from D-Drill carried out the 45° cut of kerbs around the 45m circumference of a central
October 16, 2015 Read time: 2 mins
The D-Kerb, a new machine that cuts granite kerbs to 45° without removing them, has just completed several road projects in London.

Local authorities and highways maintenance crew no longer have the cost or inconvenience of replacing them completely, said Julie White, managing director of the company 8254 D-Drill and also a co-inventor of the D-Kerb machine.

During a highways project in Offord Road, North London, technicians from D-Drill carried out the 45° cut of kerbs around the 45m circumference of a central reservation. The company, working on behalf of main contractor Volka CVV, then used a newly imported vapour blasting machine to give the kerbs an authentic, textured edge to ensure the aesthetics were maintained with the rest of the street. The firm also provided a gradual transitional cut from 45° to 90° at each end of the project. The reason for the work was to make it a more cycle-friendly environment for hundreds of cyclists who bike past the reservation on a daily basis. Julie White said: “I am so pleased that the D-Kerb machine is already proving so popular and is providing a practical, cost-effective solution. “I invented the machine to meet a specific need around cycle lanes. I explored if there was anything else like it on the market and when I discovered that there wasn’t, I came up with the design.

“It’s the only machine of its type in the world and with cycling and cycle lanes becoming increasingly popular, it could be extremely busy over the next few years – especially in London and other major cities in the UK.”

She added: “We’ve brought in the vapour blasting machine from the USA to ensure we give the kerbs the right textured finish and they do look great – it’s also better from a health & safety point of view because there is less hand/arm vibration than with other methods.”

For more information on companies in this article

Related Content

  • Materials testing developments include a new in-depth training service
    April 4, 2014
    Among the new developments in materials testing highlighted this month is a brand new idea from one manufacturer: in-depth training to help upskill technicians in developing countries - Kristina Smith reports CONTROLS has added another dimension to its business with the launch of a specialist training service: CONTROLS Academy Centre. In what the construction testing equipment manufacturer believes is a first for the industry, CONTROLS will be providing in-depth theoretical and practical training to thos
  • Volvo CE US$100 million Americas expansion
    March 22, 2013
    Volvo Construction Equipment president Pal Olney stressed the long-term importance to the company of the North American market while formally recognising the industry giant’s US$100 million expansion programme at its Shippensburg, Pennsylvania facility. Olney cut the ribbon to officially open Volvo CE’s new Americas’ headquarters building. The event also saw the unveiling of the first wheeled loader to roll off the Shippensburg site’s cutting edge assembly line. On the significance of the two big landmarks,
  • Turning the construction industry green
    July 19, 2023
    Green is good for industry – delivering sustainability can also help reduce costs for construction firms, ensuring better financial performance
  • Micro surfacing the Brooklyn Bridge with Bergkamps’ M210 paver
    May 16, 2018
    A major job for micro surfacing took place on the Brooklyn Bridge near New York. It was the third time in Ken Messina’s career that he would provide micro surfacing for the iconic Brooklyn Bridge, built in 1883. Messina, as president of New Jersey-based Asphalt Paving Systems (APS), knew only too well the challenges that lay ahead. And there were many. There would be only a brief window of opportunity for paving, with lane closures starting at 10pm and ending at 5am. The cool, humid atmosphere would a