Skip to main content

D-Drill cuts it at 45 degrees with its new machine, D-Kerb

The D-Kerb, a new machine that cuts granite kerbs to 45° without removing them, has just completed several road projects in London. Local authorities and highways maintenance crew no longer have the cost or inconvenience of replacing them completely, said Julie White, managing director of the company D-Drill and also a co-inventor of the D-Kerb machine. During a highways project in Offord Road, North London, technicians from D-Drill carried out the 45° cut of kerbs around the 45m circumference of a central
October 16, 2015 Read time: 2 mins
The D-Kerb, a new machine that cuts granite kerbs to 45° without removing them, has just completed several road projects in London.

Local authorities and highways maintenance crew no longer have the cost or inconvenience of replacing them completely, said Julie White, managing director of the company 8254 D-Drill and also a co-inventor of the D-Kerb machine.

During a highways project in Offord Road, North London, technicians from D-Drill carried out the 45° cut of kerbs around the 45m circumference of a central reservation. The company, working on behalf of main contractor Volka CVV, then used a newly imported vapour blasting machine to give the kerbs an authentic, textured edge to ensure the aesthetics were maintained with the rest of the street. The firm also provided a gradual transitional cut from 45° to 90° at each end of the project. The reason for the work was to make it a more cycle-friendly environment for hundreds of cyclists who bike past the reservation on a daily basis. Julie White said: “I am so pleased that the D-Kerb machine is already proving so popular and is providing a practical, cost-effective solution. “I invented the machine to meet a specific need around cycle lanes. I explored if there was anything else like it on the market and when I discovered that there wasn’t, I came up with the design.

“It’s the only machine of its type in the world and with cycling and cycle lanes becoming increasingly popular, it could be extremely busy over the next few years – especially in London and other major cities in the UK.”

She added: “We’ve brought in the vapour blasting machine from the USA to ensure we give the kerbs the right textured finish and they do look great – it’s also better from a health & safety point of view because there is less hand/arm vibration than with other methods.”

For more information on companies in this article

Related Content

  • Machine control technology allows more efficient paving
    March 3, 2015
    In the US, a specialist contractor is making savings with new 3D technology for concrete paving. US contractor Gehring Construction is a specialist in concrete paving and is a long-time customer of GOMACO. Having bought its first GOMACO unit in 1973, Gehring has a good deal of experience in this segment. The company is now using some of the latest machine control technology, having bought a Topcon Millimetre GPS 3D stringless system, which has been used on a bypass project around the US city of Colombus. T
  • New version of world’s longest floating bridge
    August 12, 2014
    The creation of a new version of the world’s longest floating bridge in Seattle, in the US state of Washington, is among the world’s most eye-catching current bridge engineering projects. It is an impressive example of the health of the bridge replacement sector, particularly in the US, leaving it well placed for growth. Guy Woodford reports Already the world’s longest floating bridge at over 2,310m long, the Governor Albert D Rosellini-Evergreen Point Floating Bridge in Seattle in the United States is g
  • Responsive roadsign developed by student
    August 22, 2013
    A UK student hopes his new lenticular road signs which ‘pulse’ at drivers will lead to a revolution in the way motorists are given information on the roads. Meanwhile, a leading road marking firm is helping keep tourists safe in a spiritually significant town in Umbria, Italy. Guy Woodford reports You may think Charles Gale’s vision of creating the first ‘pulsing’ lenticular road sign was the result of months, even years, spent studying traffic and driver behaviour on the roads of his adopted student c
  • Sandvik’s Turkish delight at groundbreaking tunnel vision
    May 20, 2014
    Turkey’s longest, and what will be the world’s fourth longest, highway tunnel is being built under Mount Ovit in the northeast of the country. Sandvik Construction is playing a vital role in the construction of the giant new structure, which will enable all-year-round access to what is a relatively remote and often snow-blocked part of Anatolia Having had their freedom of movement blighted for many years by wintertime snow blocking the D925 highway, along with narrower roads and passes, at Mount Ovit, resi