Skip to main content

Sophisticated machine control for slipforming

The use of 3D stringless controls in large concrete paving work is very well established. However, the lower cost of these systems means that the technology is now being used widely for smaller slipforming works, such as kerbing or drain construction
March 10, 2021 Read time: 3 mins
The latest stringless technology from Leica Geosystems is said to be easy to use

These systems for concrete slipforming are becoming more popular and help deal with business challenges such as labour shortages, competitive bidding, and future sustainability.

Elliot Jones, managing partner of 3D Concrete Solutions, has a different perspective, “I looked at it as training wheels. It kind of keeps us in the rails. I feel a lot better with having this control.”

The firm was already well established in the construction market in the earthmoving sector. And as the company had experienced difficulties with local companies carrying out concrete work, the firm saw this as an opportunity to establish its own specialist business. Diverging from the earthmoving business was a big move, however, as the company had no prior hand forming or slipforming experience.

From the beginning, Jones said that he wanted the concrete company to be the first in the region running a stringless slipform machine. As the company has worked with machine control on earthmoving equipment for 10 years Jones had seen green operators successfully trained on dozers or motor graders using 3D systems. He was confident that a slipform operator could be trained similarly and felt good about using 3D tools for stringless slipforming.

Jones and Rusty Grimes, president, visited the Power Curbers manufacturing facility and opted for a new 5700-D slipformer. The decision was made also to purchase a control system to go with the slipformer.

Using stringless technology offers key advantages for concrete slipforming
Using stringless technology offers key advantages for concrete slipforming

One of the primary reasons Jones insisted upon starting with 3D controls was avoiding stringline limitations. He stated, “you are saving at least a day on a small job, a half-day to set up and a half-day to break down or anywhere from two days or more for a larger job. You only have so many linear feet of pins, and you have to leapfrog them. That is your bottleneck.” However, with stringless controls, Jones pointed out, “your bottleneck isn’t how many pins; it becomes: control is here, total stations are here, we can keep leapfrogging those bad boys until the concrete plant shuts us down. There are no limits now.” Grimes continued, “it saves costs with the survey and guys putting out stringline and pins. We can roll in there, localise everything in an hour or two, and we are off and running. We’ve done as much as 4,000 linear feet or more, and that’s only because we ran out of mud.”

Not only is 3D Concrete Solutions seeing time and money savings, but the quality is superior. “They’ve verified vertical tolerances as small as 0.02”. Jones reported that “it’s better than stringline. The stringline gets manipulated by people on the jobsite. There is room for human error. If you follow the model, it is perfectly to the engineer’s plan.” After a number of completed jobs, Jones expressed that the 5700-D with Leica controls has been highly successful for quality and productivity, as well as proving popular with the paving crew. 

For more information on companies in this article

Related Content

  • Topcon: innovation legacy drives democratisation
    February 25, 2025
    Topcon has a legacy of innovation with positioning technologies, and is now translating these groundbreaking inventions into affordable solutions - the democratisation of technology - to meet the needs of clients today. Ray O'Connor, formerly the CEO and President of Topcon Positioning Systems, is now Chairman. He and Ivan Di Federico, who is now President and CEO, explain what it takes to create a future built on a strong heritage. David Arminas reports.
  • Well-educated personnel are the best investment for the future says the Ammann international training centre
    May 20, 2014
    Far too often, managers will view training as a luxury and not as a competitive and strategic necessity. Lazy team leaders regularly argue that it is a waste of time and money training their people, not least because these same trainees might subsequently leave the organisation. Courses are seen as an interruption, and a good way to delay things. There is always something much more pressing and important on the to-do list and staff can end up feeling forced into the training department. But these are weak a
  • Customer Comes Full Circle with Komatsu iMC 2.0
    April 4, 2022
    In 2017, the Budorealizacja company from Myślenice, Poland started using the first ever Komatsu intelligent Machine Control (iMC) excavator to be delivered in the country. Over four years on, the company now owns 10 Komatsu iMC machines across both excavators and dozers, and significantly, its fleet was further expanded when they recently became the first Polish customer to take delivery of an iMC 2.0 version of the PC210LCi-11
  • New opportunities for connected construction technology
    June 20, 2025

    Trimble is one of the leaders in the field for connected construction technology, with an impressive share of the market as well as a reputation for delivering some of the most sophisticated solutions. The company is keen to retain its role as a leader and is also reinforcing its position in key market segments.