Skip to main content

A solution for Michigan road repairs

Roads all over the US state of Michigan are in desperate need of repair, but cities do not always have enough money to fix them. However, the city of Jackson could help pave the way toward a solution. An project on a small street in Jackson could help communities across the state in the future. Lydia Street connects Wildwood with Michigan Avenue near downtown Jackson and has been repaired using a new product from supplier 3M. The special concrete features a mixture that is better able to withstand the freez
May 22, 2018 Read time: 2 mins

Roads all over the US state of Michigan are in desperate need of repair, but cities do not always have enough money to fix them. However, the city of Jackson could help pave the way toward a solution. An project on a small street in Jackson could help communities across the state in the future. Lydia Street connects Wildwood with Michigan Avenue near downtown Jackson and has been repaired using a new product from supplier 152 3M. The special concrete features a mixture that is better able to withstand the freeze-thaw cycle, which is at the root of many of Michigan’s road problems. The novel mix benefits from a combination of stronger materials and more oxygen. Comprising finely crushed granite, the material is said to ensure a greater stability during curing, leading to improved durability. Should the trial of this new solution go to plan, Michigan Department of Transport (MDOT) will begin using the material more widely across the state. The material is expected to cut costs considerably in the future, due to its extended life in the tough climate.

For more information on companies in this article

Related Content

  • Construction materials and road design in East Africa
    June 25, 2013
    An envisaged shortage in the supply of angular rock or crushed stone in Tanzania and a determination to conserve the environment by Kenyan authorities dictated the engineering design of a multi-national road linking the two largest economies in Eastern Africa. Shem Oirere reports The cost of buying crushed stone or hiring a site for mining the material and the expenses of moving it from the crushing site to the project area, saw designers opt for an intermediate alignment and discarding of the inner and out
  • Expanded and branded
    October 4, 2022
    Connected-up cycling is becoming more important in France as the way to keep cyclists from giving up their COVID habit of pedalling to work and for pleasure. David Arminas reports
  • New business cases for the deployment of automated vehicles in transport
    November 25, 2020
    Adapting roadway infrastructure to the needs and opportunities of a rapidly automating vehicle fleet remains a pressing issue for government agencies worldwide.
  • Parsons Brinckerhoff working on Detroit traffic plan
    December 16, 2013
    The Detroit Downtown Development Authority (DDA) has awarded a traffic research deal for the city's I-375 corridor in the US. Traffic and planning consultant Parsons Brinckerhoff won the deal, worth nearly US$373,000. The Michigan Department of Transportation (MDOT) and the DDA will decide whether to convert the corridor into a surface street to improve pedestrian access or to reconstruct it. The study will also include consultation with major downtown employers like Blue Cross Blue Shield of Michigan and G