Skip to main content

A solution for Michigan road repairs

Roads all over the US state of Michigan are in desperate need of repair, but cities do not always have enough money to fix them. However, the city of Jackson could help pave the way toward a solution. An project on a small street in Jackson could help communities across the state in the future. Lydia Street connects Wildwood with Michigan Avenue near downtown Jackson and has been repaired using a new product from supplier 3M. The special concrete features a mixture that is better able to withstand the freez
May 22, 2018 Read time: 2 mins

Roads all over the US state of Michigan are in desperate need of repair, but cities do not always have enough money to fix them. However, the city of Jackson could help pave the way toward a solution. An project on a small street in Jackson could help communities across the state in the future. Lydia Street connects Wildwood with Michigan Avenue near downtown Jackson and has been repaired using a new product from supplier 152 3M. The special concrete features a mixture that is better able to withstand the freeze-thaw cycle, which is at the root of many of Michigan’s road problems. The novel mix benefits from a combination of stronger materials and more oxygen. Comprising finely crushed granite, the material is said to ensure a greater stability during curing, leading to improved durability. Should the trial of this new solution go to plan, Michigan Department of Transport (MDOT) will begin using the material more widely across the state. The material is expected to cut costs considerably in the future, due to its extended life in the tough climate.

For more information on companies in this article

Related Content

  • Machine control technology shortens road contract
    May 28, 2013
    The use of sophisticated machine control technology has helped halve the schedule required for a road contract – Jeff Winke. By using the latest machine control systems on the equipment fleet, a US contractor has managed to halve worker hours, machine time and overall costs. “We chopped 50% off the contract schedule,” said Jim Swenson, licensed professional land surveyor for Oregon Mainline Paving based in McMinnville, Oregon. “The project was completed a year ahead of the two-year schedule,” he explained
  • Machine control used for road revamp for Arkansas highway
    June 23, 2015
    A historic route in the US state of Arkansas has benefited from the use of machine control during its upgrade The south-west - north-east US Route 67 in Arkansas has long been a significant transport route. This old road follows the natural break between the Ozark Mountains and the Ouachita Mountains. In the 1920s, funding became available for road paving, and the route was designated US Route 67.
  • Optimised machines improve aggregate production
    February 27, 2012
    Improving aggregate production and quality levels is not just about investing in the latest equipment but making sure existing machines are optimised - Claire Symes reports. Although the cost of fuel has dropped since last summer's high, reducing the cost/tonne of production is still high on the agenda for most quarry operators, along with improving quality.
  • Climate change is damaging roads
    August 16, 2018
    With 2018 well under way, the ravages of extreme weather in recent months is now sadly apparent on the road network in many countries, and even on many continents. In East Africa, heavy rains have overwhelmed storm drains in many areas, with flood waters washing away vehicles and damaging road surfaces in urban and rural areas alike. Road repairs are now having to be carried out in Kenya, Rwanda, Tanzania and Uganda to patch up surfaces that have been washed away, along with the replacement of signage and