Skip to main content

A solution for Michigan road repairs

Roads all over the US state of Michigan are in desperate need of repair, but cities do not always have enough money to fix them. However, the city of Jackson could help pave the way toward a solution. An project on a small street in Jackson could help communities across the state in the future. Lydia Street connects Wildwood with Michigan Avenue near downtown Jackson and has been repaired using a new product from supplier 3M. The special concrete features a mixture that is better able to withstand the freez
May 22, 2018 Read time: 2 mins

Roads all over the US state of Michigan are in desperate need of repair, but cities do not always have enough money to fix them. However, the city of Jackson could help pave the way toward a solution. An project on a small street in Jackson could help communities across the state in the future. Lydia Street connects Wildwood with Michigan Avenue near downtown Jackson and has been repaired using a new product from supplier 152 3M. The special concrete features a mixture that is better able to withstand the freeze-thaw cycle, which is at the root of many of Michigan’s road problems. The novel mix benefits from a combination of stronger materials and more oxygen. Comprising finely crushed granite, the material is said to ensure a greater stability during curing, leading to improved durability. Should the trial of this new solution go to plan, Michigan Department of Transport (MDOT) will begin using the material more widely across the state. The material is expected to cut costs considerably in the future, due to its extended life in the tough climate.

For more information on companies in this article

Related Content

  • Green is good for road construction with National Highways
    July 25, 2024
    Green technology is now good for road construction with National Highways.
  • Making the U-turn
    August 2, 2012
    Political hostility to a toll road project in Australia has been turned around by the quality and amenity of the project writes Adrian Greeman Cars, trucks and vans were taking to the new EastLink toll road in Melbourne with enthusiasm this July, pleased to try out its 39km route for time and cost savings. As well as the convenience of the uncongested route, drivers were also able to view an extraordinary multi-shaded perspective of transparent green and orange noise wall panels, burnt earth-coloured retai
  • CEA conference 2018 – focusing on technology solutions
    May 2, 2018
    New technology and reduced machine emissions were amongst the key topics at the CEA conference in London - Mike Woof writes. Construction machine manufacturers are going to have to find new solutions if targets on emissions controls are going to be met. This is a clear viewpoint for the industry. But as the speakers at the recent CEA conference in London showed, there are differing opinions on how that will be achieved and what technical solutions will come to the fore. Duncan Riding, business development
  • The elixir ReLIXIR from Sripath Technologies
    February 22, 2022
    ReLIXIR rejuvenator is a low-viscosity, free-flowing blend of bio-based oils that can easily be pumped from tote or bulk tank into the bitumen tank, injected into the bitumen feed line to a drum or batch plant or directly onto RAP particles on a conveyor.