Skip to main content

A solution for Michigan road repairs

Roads all over the US state of Michigan are in desperate need of repair, but cities do not always have enough money to fix them. However, the city of Jackson could help pave the way toward a solution. An project on a small street in Jackson could help communities across the state in the future. Lydia Street connects Wildwood with Michigan Avenue near downtown Jackson and has been repaired using a new product from supplier 3M. The special concrete features a mixture that is better able to withstand the freez
May 22, 2018 Read time: 2 mins

Roads all over the US state of Michigan are in desperate need of repair, but cities do not always have enough money to fix them. However, the city of Jackson could help pave the way toward a solution. An project on a small street in Jackson could help communities across the state in the future. Lydia Street connects Wildwood with Michigan Avenue near downtown Jackson and has been repaired using a new product from supplier 152 3M. The special concrete features a mixture that is better able to withstand the freeze-thaw cycle, which is at the root of many of Michigan’s road problems. The novel mix benefits from a combination of stronger materials and more oxygen. Comprising finely crushed granite, the material is said to ensure a greater stability during curing, leading to improved durability. Should the trial of this new solution go to plan, Michigan Department of Transport (MDOT) will begin using the material more widely across the state. The material is expected to cut costs considerably in the future, due to its extended life in the tough climate.

For more information on companies in this article

Related Content

  • Sandvik's 'quiet' quarry solution
    February 6, 2012
    A Hanson quarry in Spain is now benefiting from the installation of lining plates in its crushing plant. The J Riera, Llinar del Valles Quarry in Catalonia is using WT6000 linings supplied by Sandvik in the plant's primary hopper. The material was chosen for this tough application as the quarry company wanted to reduce wear and tear on its equipment and cut noise from the site. The hopper is the main intake for feed material in the plant and the rock is blasted granite, with a high abrasive index and a maxi
  • New Vietnam bridge project to cut congestion
    October 24, 2016
    A new bridge project in Vietnam’s Ho Chi Minh City will help cut traffic congestion. The project is expected to cost in the region of US$157 million and four contractors will work on the construction of the 3.2km long Bình Tiên Bridge. The plans call for the bridge to carry four traffic lanes and be from 30-40m wide, although the design has yet to be finalised. The work will be carried out in two separate sections, while the client for the Bình Tiên Bridge and Road project is Ho Chi Minh’s Transport Departm
  • Weigh in motion and ANPR techology aid highway protection
    April 10, 2012
    Weigh-in-motion technology manufacturers have been involved in a number of significant highways tolling projects across the world in recent months, while others are looking to become involved in major new initiatives. Guy Woodford reports. The continuing global economic crisis did not prevent UK-based TDC Traffic Systems from recently securing the prized US$2.84million (€2.14million) contract to supply 20 high speed weigh-in-motion (WIM) systems for overweight pre-selection and enforcement in Saudi Arabia
  • LafargeHolcim wins Highway 1 deal in Vancouver, Canada
    January 3, 2019
    LafargeHolcim has been awarded infrastructure contracts worth more than US$73.5 million as part of a major Highway 1 improvement project in Vancouver, Canada. Highway 1 – also called the TransCanada Highway – is a vital economic link for many local, regional and provincial towns and cities across the country, from the Atlantic to Pacific coasts. For the work in the Vancouver area, LafargeHolcim will be the prime contractor as awarded by the Ministry of Transportation and Infrastructure for the provinc