Skip to main content

Smoothing concrete for airport runway

A contractor in the US is now using a piece of equipment for a specific application on a project at Dallas Fort Worth (DFW) Airport. The job required equipment able to deliver high quality to meet tough client requirements, so the contractor decided to use s 255CD Triple Roller Tube Paver from Allen Engineering.
July 28, 2015 Read time: 2 mins
A contractor in the US is now using a piece of equipment for a specific application on a project at Dallas Fort Worth (DFW) Airport. The job required equipment able to deliver high quality to meet tough client requirements, so the contractor decided to use s 255CD Triple Roller Tube Paver from 156 Allen Engineering.

Contractor Haydon Building Corporation had plenty of in-house experience using a variety concrete equipment but had never employed anything from Allen Engineering previously. So when the contractor called Ram Tool in Dallas inquiring about equipment to meet specific requirements, this was passed on to the Allen Territory Sales Representative.

Taking place at the DFW Airport, the project was a taxiway construction. At first, the Allen Territory Sales Representative suggested using an RS844 paver with augers. But after learning that the slump would be 25-50mm, the Allen Territory Sales Representative realised that the contractor needed a machine that could handle a slump that low.

Haydon Building Corporation took around three months before it made the decision to use the Triple Roller Tube Paver. But this unit was able to carry out the job successfully.

For more information on companies in this article

Related Content

  • Kosovo's award-winning green highway construction
    March 20, 2012
    A new highway is proving an economic lifeline for the tiny country of Kosovo – Mike Woof reports. Road projects in Europe rarely meet such widespread public approval and support as the new Route 7 highway being built in the new Balkan state of Kosovo. The first sections of the new road opened to traffic in November 2011, with locals turning out in large numbers to celebrate the event. The official opening was carried out by the country’s prime minister Hashim Thaçi, president Atifete Jahjaga, and members of
  • Brisbane’s Airport: Innovative Management of One of the World’s Busiest Runways
    June 26, 2014
    When it comes to runways, there are few busier then Brisbane’s main runway. Servicing both domestic and international travel, with over 200,000 movements per year, operating without a curfew Brisbane’s main runway is the busiest in Australia. For maintenance, crews only have a limited period of time to determine the pavement condition, normally during the night, making the detection of pavement faults difficult. To resolve this issue, a new high speed pavement scanner was used to rapidly survey the pavem
  • Improved pavers from Volvo CE
    March 24, 2020
    Volvo CE says that its latest P8820D ABG and P6870D ABG paver models combines size and versatility. The improved D-series variants benefit from a new design and smart features that are said to boost reliability and productivity.
  • Building a replacement bridge in record time
    March 13, 2023
    The construction of a new bridge in Pittsburgh, Pennsylvania to replace a collapsed structure has been carried out in record time