Skip to main content

Smoothing concrete for airport runway

A contractor in the US is now using a piece of equipment for a specific application on a project at Dallas Fort Worth (DFW) Airport. The job required equipment able to deliver high quality to meet tough client requirements, so the contractor decided to use s 255CD Triple Roller Tube Paver from Allen Engineering.
July 28, 2015 Read time: 2 mins
A contractor in the US is now using a piece of equipment for a specific application on a project at Dallas Fort Worth (DFW) Airport. The job required equipment able to deliver high quality to meet tough client requirements, so the contractor decided to use s 255CD Triple Roller Tube Paver from 156 Allen Engineering.

Contractor Haydon Building Corporation had plenty of in-house experience using a variety concrete equipment but had never employed anything from Allen Engineering previously. So when the contractor called Ram Tool in Dallas inquiring about equipment to meet specific requirements, this was passed on to the Allen Territory Sales Representative.

Taking place at the DFW Airport, the project was a taxiway construction. At first, the Allen Territory Sales Representative suggested using an RS844 paver with augers. But after learning that the slump would be 25-50mm, the Allen Territory Sales Representative realised that the contractor needed a machine that could handle a slump that low.

Haydon Building Corporation took around three months before it made the decision to use the Triple Roller Tube Paver. But this unit was able to carry out the job successfully.

For more information on companies in this article

Related Content

  • Building Egypt's world class Desert Highway
    April 13, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports. The work to upgrade the Desert Highway connecting Egypt's sprawling capital Cairo with its major port Alexandria, is one of the country's largest infrastructure projects for many years. This 220km highway link is being widened and improved to cope with the hugely increased traffic volumes resulting partly from Egypt's fast growing vehicle population. The Egyptian economy is strong
  • Busy bridge in Beijing replaced quickly
    March 31, 2016
    The replacement of a very busy road bridge in China’s capital Beijing has been carried out successfully. Due to the volume of traffic using the bridge during week days, the work had to be carried out quickly so as to minimise traffic disruption. But despite being carried out in the centre of Beijing, the replacement work for the Sanyuan Bridge just took 43 hours from start to completion.
  • G&Z paving Canada’s longest runway
    October 12, 2012
    A contractor in Canada, Dufferin Construction, is using three items of new equipment bought from Guntert & Zimmerman to pave the country’s longest runway. The project is extensive, featuring a new runway measuring 4.3km long by 60m wide, an apron area measuring 145,000m2 and two taxiways, each 3.8km long by 25m wide. In all, the work requires 1.5 million tonnes of base aggregate, and 200,000m2 of cement-stabilised base. Dufferin Construction Company, a division of Holcim (Canada) already owns two other G&Z
  • Building Egypt's world class Desert Highway
    February 9, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports