Skip to main content

Slipforming versatility from Miller

Miller Formless claims versatility for the latest versions of its concrete slipformers, the M-1000, M-8100 and top-of-the-range M-8800.
January 28, 2020 Read time: 2 mins
The three slipformer models from Miller Formless share key features such as control packages and telematics systems

The three machines are all powered by Tier 4 Final emissions compliant diesels. The M-1000 has a diesel delivering 73kW while the M-8100 and M-8800 have diesels delivering 129kW. All three models are four-track machines that feature the firm’s latest MFS control system, which includes a remote unit that allows the operator to stand in a position to best view the working area. In addition, the three machines are fitted with the necessary connections so that they are ready to use 3D control technology from key suppliers.

The machines can all be equipped with sophisticated telematics packages that can deliver real time data for remote monitoring. A wide range of options are available for all three models, including urethane and steel track pads and umbrella assemblies.

All three can be configured for right- or left-hand pouring. The versatile M-1000 can pour radii as tight as 610mm, as well as widths up to 1.52m, and measures just 2.59m wide for transport. Moving up in size, the M-8100 features frame widening of up to 1.22m and can be used for shoulder paving up to 3.65m and up to 4.87m for straddle paving. It can also be used for applications such as kerbing or forming barrier walls. The M8800 also offers 1.22m of frame widening and can be used for shoulder paving up to 3.66m wide and straddle paving up to 6.1m wide, as well as barriers up to 2.59m high.

For more information on companies in this article

Related Content

  • Sophisticated slipformer control from Wirtgen
    August 10, 2018
    Wirtgen is now offering a new version of its concrete slipformer control package. This new tool offers additional capabilities and improved performance over the earlier version. The company claims that its upgraded Wirtgen AutoPilot 2.0 package can deliver a higher paving accuracy along with lower costs. Newly-developed, this package is said to produce a wide array of offset and inset profiles, while also delivering these more economically and precisely than with the previous version. The 3D system can eit
  • Wirtgen slipform paver works in Brazil road contract
    May 15, 2015
    Local contractor Galvão Engenharia opted to use an SP 850 slipform paver from Wirtgen as one of the key machines in the job to upgrade and improve the Anel Viário de Fortaleza. This important highway connects Fortaleza, located in the federal state of Ceará, with the busy port of Pecém. The deepwater port in Pecém is some 60km from Fortaleza and since it was inaugurated in 2002, the city has become a primary port for exporting fruit products in refrigerated containers. Fuel and liquefied gas, fertilizer
  • Caterpillar’s versatile, short tailswing excavator
    March 9, 2016
    Caterpillar claims that its new 25tonne compact radius excavator offers increased performance and capabilities over the firm’s earlier model in this class. The 325F is powered by a Cat C4.4 ACERT engine rated at 120kW and which meets the Tier 4 Final/Stage IV emissions requirements while the excavator also benefits from an upgraded hydraulic system. The machine has a full-size, ROPS-equipped cab said to offer safety and comfort, as well as good all-round visibility. The machine is available with technolo
  • Machine control technology shortens road contract
    May 28, 2013
    The use of sophisticated machine control technology has helped halve the schedule required for a road contract – Jeff Winke. By using the latest machine control systems on the equipment fleet, a US contractor has managed to halve worker hours, machine time and overall costs. “We chopped 50% off the contract schedule,” said Jim Swenson, licensed professional land surveyor for Oregon Mainline Paving based in McMinnville, Oregon. “The project was completed a year ahead of the two-year schedule,” he explained