Skip to main content

Seal of approval for Sika

Skikaflex Construction by UK-based Sika was chosen by Skanska Balfour Beatty Joint Venture to seal movement joints during the widening of one of Europe’s busiest motorways. The M25, also known as the London Orbital, handles around 200,000 vehicles every day on its busiest sections. Its widening between junctions 27 and 30 is said to be delivering much needed extra capacity to tackle congestion and improve journey times.
June 22, 2012 Read time: 2 mins
Skikaflex Construction  by UK-based Sika was chosen by 2296 Skanska 1146 Balfour Beatty Joint Venture to seal movement joints during the widening of one of Europe’s busiest motorways.

The M25, also known as the London Orbital, handles around 200,000 vehicles every day on its busiest sections. Its widening between junctions 27 and 30 is said to be delivering much needed extra capacity to tackle congestion and improve journey times.

In 2002, the London Orbital Multi Model Study (ORBIT) was tasked with addressing the problem. The ORBIT report recommended that most of the dual 3 lane sections of the M25 should be widened to 4 lanes.

The widening project is being carried out by Skanska Balfour Beatty Joint Venture for Connect Plus, working on behalf of the 2309 Highways Agency, as part of the Design Build Finance and Operate Contract for the M25.                                                   

Said to be a high performance product, Sikaflex Construction (SC) has been used to seal the vertical movement joints of the newly constructed reinforced concrete walls at the Emergency Access Routes situated behind the embankment piers of the widened motorway section.  It has also been used to seal the horizontal movement joints of the newly constructed reinforced concrete pier protection and pier strengthening at various bridge locations between junctions 27 and 30.

SC was used to create what was said to be a 100% watertight seal. A one part polyurethane sealant, it is also described as a versatile sealant that can be used for a variety of construction and civil engineering purposes. Said to be easy to install and environmentally friendly, the SC is stain resistant and can be over painted. Crucially, once installed it provides a seal that is impregnable by water, dirt, dust and chemicals.

Available in four standard colours, SC is supplied in 600cc foil sausages for easy on site application by gun. Conforming to ISO 11600 Class F25HM/F20LM, it offers a cost effective method of sealing construction joints of up to 35mm.

Chosen for what was said to be its tear resistance and ability to withstand dirt, water and chemical attack, Sika said its SC provided the ideal solution to protect the concrete retaining walls on the M25.

For more information on companies in this article

Related Content

  • Bridge improvements reduce flood threat
    April 4, 2012
    The impact of the new Eden Bridge over the River Eden on its flood plain is a key issue to the construction of the Carlisle Northern Development Route (CNDR).
  • Highways England awards €2.1 billion of upgrades for UK motorways
    August 7, 2015
    Highways England has today appointed six joint-venture companies to design and build 10 “smart motorways” as part of a €2.1 billion investment. Construction contractors appointed are the Balfour Beatty and VINCI joint venture, a Costain and Galliford Try joint venture, as well as a Carillion and Kier joint venture. Designers are a CHM2 and Hyder joint venture, an Amey and Arup joint venture, as well as a Jacobs and Atkins joint venture. The award is the second major procurement to be given under th
  • UK widening contract awarded to
    September 21, 2015
    A joint venture formed of Balfour Beatty and Carillion has won the tender process for a €401 million (£292 million) road widening package in the UK. The joint venture will commence with preparatory works worth €686,680 (£500,000) initially as the main contract is subject to approval of the wider A14 improvement scheme. The aim of the joint venture’s work is to upgrade the A14 between Swavesey and Milton. This forms part of the wider A14 Cambridge to Huntingdon road improvement scheme. The joint venture is a
  • 'Soft' option gets results
    February 8, 2012
    Soft engineering techniques, used to prevent soil erosion and stabilise steep cuts and embankments, have allowed engineers to successfully widen the M1 motorway in the UK. Over the 50km length of the work (25km northbound, 25km southbound) on a busy section of the motorway near the city of Nottingham, a total of 48km of slopes had to be modified, split roughly between cutting and embankment. The UK Highways Agency requirements for the work meant that wholesale widening of the corridor was not possible: the