Skip to main content

Seal of approval for Sika

Skikaflex Construction by UK-based Sika was chosen by Skanska Balfour Beatty Joint Venture to seal movement joints during the widening of one of Europe’s busiest motorways. The M25, also known as the London Orbital, handles around 200,000 vehicles every day on its busiest sections. Its widening between junctions 27 and 30 is said to be delivering much needed extra capacity to tackle congestion and improve journey times.
June 22, 2012 Read time: 2 mins
Skikaflex Construction  by UK-based Sika was chosen by 2296 Skanska 1146 Balfour Beatty Joint Venture to seal movement joints during the widening of one of Europe’s busiest motorways.

The M25, also known as the London Orbital, handles around 200,000 vehicles every day on its busiest sections. Its widening between junctions 27 and 30 is said to be delivering much needed extra capacity to tackle congestion and improve journey times.

In 2002, the London Orbital Multi Model Study (ORBIT) was tasked with addressing the problem. The ORBIT report recommended that most of the dual 3 lane sections of the M25 should be widened to 4 lanes.

The widening project is being carried out by Skanska Balfour Beatty Joint Venture for Connect Plus, working on behalf of the 2309 Highways Agency, as part of the Design Build Finance and Operate Contract for the M25.                                                   

Said to be a high performance product, Sikaflex Construction (SC) has been used to seal the vertical movement joints of the newly constructed reinforced concrete walls at the Emergency Access Routes situated behind the embankment piers of the widened motorway section.  It has also been used to seal the horizontal movement joints of the newly constructed reinforced concrete pier protection and pier strengthening at various bridge locations between junctions 27 and 30.

SC was used to create what was said to be a 100% watertight seal. A one part polyurethane sealant, it is also described as a versatile sealant that can be used for a variety of construction and civil engineering purposes. Said to be easy to install and environmentally friendly, the SC is stain resistant and can be over painted. Crucially, once installed it provides a seal that is impregnable by water, dirt, dust and chemicals.

Available in four standard colours, SC is supplied in 600cc foil sausages for easy on site application by gun. Conforming to ISO 11600 Class F25HM/F20LM, it offers a cost effective method of sealing construction joints of up to 35mm.

Chosen for what was said to be its tear resistance and ability to withstand dirt, water and chemical attack, Sika said its SC provided the ideal solution to protect the concrete retaining walls on the M25.

For more information on companies in this article

Related Content

  • Towers of power: California’s Gerald Desmond Bridge Replacement
    May 8, 2019
    Challenging ground conditions meant a design rethink - and some engineering firsts - for California’s Gerald Desmond Bridge Replacement Project* The Port of Long Beach on Terminal Island south of Los Angeles is the second-busiest container port in the US. It handles around 15% of all imported goods, much of it with Asia. As the Port of Long Beach was growing in importance over the past half century, the 51-year-old Gerald Desmond Bridge has faithfully been delivering thousands of daily commuters to wo
  • Upgrade for Scottish road
    February 17, 2012
    Work is progressing on a £320 million (e385 million) project to upgrade a busy 18km stretch of the main A80 Glasgow-Stirling road in Scotland to motorway standard. The project, between the villages of Stepps and Haggs, is part of a massive infrastructure investment in Scotland's transport network, and construction work includes almost 8km of new dual-lane motorway and hard shoulders between
  • Transport for London shortlist for up to US$3bn work contracts
    April 19, 2012
    Transport for London (TfL) has shortlisted ten contractors for a road maintenance framework that could be worth as much as US$3billion over eight years. The framework is split into four contracts and could cover all London roads from 2013. TfL said the framework would provide cost savings and other efficiencies. The final contracts will be awarded before the end of 2012. The ten contractors are: Amey, Balfour Beatty Living Places, Bam Nuttall-Hyder Consulting, Colas-VolkerHighways-URS Scott Wilson, Co
  • Advances in concrete paving materials
    July 9, 2012
    Innovations in materials technology, as well as machines, could provide a major boost to the concrete paving sector - Mike Woof reports Development of new material technologies for the concrete paving sector continues apace and the latest innovations could provide the biggest boost for this market in many years. High performance cementitious material (HPCM) is an innovative concept that has been developed and tested for road surfacing applications as part of a project in which the UK's Transport Research La