Skip to main content

SE-Z Drill's versatile drills

According to E-Z Drill, its Model 210 drill attachment series offers versatility and performance.The three model series is compatible with most model of backhoes and excavators and the pneumatic drills offer specially-designed features for maximum productivity and reduced maintenance. The units are capable of drilling 15.9-63.5mm holes, at a depth of 457mm.
April 13, 2012 Read time: 2 mins
The E-Z Drill tools offer versatility and durability
RSSAccording to 2976 E-Z Drill, its Model 210 drill attachment series offers versatility and performance.The three model series is compatible with most model of backhoes and excavators and the pneumatic drills offer specially-designed features for maximum productivity and reduced maintenance. The units are capable of drilling 15.9-63.5mm holes, at a depth of 457mm. Designed for quick, precise drill positioning, the 210 EQ MT drills feature a side-shift control. A side-shift feature boosts productivity by allowing a second set of holes to be drilled without the need to move the drill, backhoe or excavator. To reduce operator effort and increase hole-drilling speed, the drills feature a floating bucket curl pin. By providing the pin with a small range of motion, the drill automatically levels itself. A number of features have been incorporated into the 210 EQ MT drills to increase durability and service life. Multi-point oil injection allows each drill to be lubricated individually from a single reservoir, ensuring each drill always has the proper amount of oil. The 210 EQ MT drills offer extra height adjustment, providing access to the center of a slab, even in extreme asphalt overlay conditions.

For more information on companies in this article

Related Content

  • E-Z Drill highlights 210B-2 on-grade drills at ConExpo 2014
    January 6, 2017
    E-Z Drill’s 210B-2 on-grade drills are being showcased at ConExpo 2014. Part of the 210B Series of on-grade concrete drills and like the 210B model, the 210B-2 is a pneumatic and easy-to-position unit that drills to a standard 45.72cm depth. Both the 210B and 210B-2 drills feature a compact frame, allowing each to operate within a confined area. The units have been specifically designed for straight-line drilling on a level subgrade, and are said to be ideal for airport work, lane additions and large patchw
  • E-Z Drill highlights 210B-2 on-grade drills at ConExpo 2014
    January 29, 2014
    E-Z Drill’s 210B-2 on-grade drills are being showcased at ConExpo 2014. Part of the 210B Series of on-grade concrete drills and like the 210B model, the 210B-2 is a pneumatic and easy-to-position unit that drills to a standard 45.72cm depth. Both the 210B and 210B-2 drills feature a compact frame, allowing each to operate within a confined area. The units have been specifically designed for straight-line drilling on a level subgrade, and are said to be ideal for airport work, lane additions and large patchw
  • Advances in concrete paving materials
    July 9, 2012
    Innovations in materials technology, as well as machines, could provide a major boost to the concrete paving sector - Mike Woof reports Development of new material technologies for the concrete paving sector continues apace and the latest innovations could provide the biggest boost for this market in many years. High performance cementitious material (HPCM) is an innovative concept that has been developed and tested for road surfacing applications as part of a project in which the UK's Transport Research La
  • Versatile small construction equipment
    February 9, 2012
    Smaller construction equipment offers versatile options, particularly on highway repair and maintenance projects. Patrick Smith reports. Visitors to any highway construction site across the world will see a sizeable amount of utility equipment in action carrying out a variety of tasks. Indeed, because of its smaller, more compact size, such multi-task equipment is essential when repair and maintenance projects are being carried out, particularly in urban areas where space may be limited.