Skip to main content

Productive and reliable concrete paving

A new Power Curbers 5700-C-MAX machine is being used on a slipforming project in Tampa, Florida in the USA. The project involves major upgrades to the road link, which is being widened from two lanes to four, with two lanes in either direction. The C-MAX package from Power Curbers allows the 5700 machine to pave wider and higher forms than before. This operation involves the construction of new concrete kerbs and
February 22, 2012 Read time: 1 min
A new 307 Power Curbers 5700-C-MAX machine is being used on a slipforming project in Tampa, Florida in the USA. The project involves major upgrades to the road link, which is being widened from two lanes to four, with two lanes in either direction. The C-MAX package from Power Curbers allows the 5700 machine to pave wider and higher forms than before. This operation involves the construction of new concrete kerbs and gutters on the road. The machine is proving highly productive and reliable in the operation.

For more information on companies in this article

Related Content

  • Concrete paving precision achieved
    August 15, 2019
    A Wirtgen SP 62i slipformer has been used for the cost-effective paving of concrete slab in the US state of Texas. The machine has been utilised for construction work in College Station, a town some 150km northwest of Houston, Texas.
  • MTVs help transfer material efficiently
    June 20, 2016
    Mention the letters MTV and most people will think you’re referring to Music Television, the firm that revolutionised the music video. But in the road construction sector the letters have another meaning: Material Transfer Vehicle. Roadtec pioneered the MTV concept with its Shuttle Buggy, which it introduced in 1989. The concept was a novel one, providing a transition between the truck hauling the asphalt to the site and the asphalt paver. The idea of the machine was that it would provide a buffer system
  • New highway to connect Uzbekistan capital
    October 30, 2013
    In Uzbekistan work is commencing on a key link of the highway connecting capital Tashkent to Osh. The 58km section of the A373 being improved runs though the Kamchik mountain pass and needs to be upgraded due to wear and tear from the winter weather conditions as well as being widened to handle growing traffic levels. The work will be completed by mid-2014 and is costing some US$211 million. The existing road features a single lane running in either direction. The work involves widening the highway so that
  • Key expressway route through Hunter Valley
    November 11, 2013
    Australia’s Hunter Valley will benefit from a new high speed expressway, which is currently under construction - Simon Gould reports Located two hours north of Sydney, the Hunter Valley region in New South Wales is one of Australia’s largest producers of coal and wine. With international demand, particularly from Asia, for both continuing to increase, a significant upgrade of infrastructure was required between the region and the port of Newcastle, the world’s largest coal export port. However the strict en