Skip to main content

Productive and reliable concrete paving

A new Power Curbers 5700-C-MAX machine is being used on a slipforming project in Tampa, Florida in the USA. The project involves major upgrades to the road link, which is being widened from two lanes to four, with two lanes in either direction. The C-MAX package from Power Curbers allows the 5700 machine to pave wider and higher forms than before. This operation involves the construction of new concrete kerbs and
February 22, 2012 Read time: 1 min
A new 307 Power Curbers 5700-C-MAX machine is being used on a slipforming project in Tampa, Florida in the USA. The project involves major upgrades to the road link, which is being widened from two lanes to four, with two lanes in either direction. The C-MAX package from Power Curbers allows the 5700 machine to pave wider and higher forms than before. This operation involves the construction of new concrete kerbs and gutters on the road. The machine is proving highly productive and reliable in the operation.

For more information on companies in this article

Related Content

  • New Zealand’s Waterview project is moving closer to completion
    December 13, 2016
    New Zealand’s biggest road project is less than a year away from completion, and a lot of progress has been made since World Highways last looked at the project two years ago - Mary Searle Bell reports New Zealand’s Waterview project is moving closer to completion and will be the largest road project in the country. The NZ$2 billion Western Ring Route will see the creation of an alternative motorway to State Highway 1, which runs through the centre of Auckland. The 47km-long motorway will allow a large p
  • Wirtgen SP 1500 dual paver solves four problems at once
    December 8, 2016
    Four job sites, four contractors, four German states, one paving method: Dual-layer concrete paving with the slipform paver SP 1500 from Wirtgen is on the road to success in Germany. Swayed by the numerous economic and technical advantages, more and more planning engineers are opting for this technology when rehabilitating concrete highways.
  • Concrete paving in Indiana
    April 2, 2021
    Important concrete paving work has been carried out in Indiana on key highway connections
  • G&Z paving Canada’s longest runway
    October 12, 2012
    A contractor in Canada, Dufferin Construction, is using three items of new equipment bought from Guntert & Zimmerman to pave the country’s longest runway. The project is extensive, featuring a new runway measuring 4.3km long by 60m wide, an apron area measuring 145,000m2 and two taxiways, each 3.8km long by 25m wide. In all, the work requires 1.5 million tonnes of base aggregate, and 200,000m2 of cement-stabilised base. Dufferin Construction Company, a division of Holcim (Canada) already owns two other G&Z