Skip to main content

Productive and reliable concrete paving

A new Power Curbers 5700-C-MAX machine is being used on a slipforming project in Tampa, Florida in the USA. The project involves major upgrades to the road link, which is being widened from two lanes to four, with two lanes in either direction. The C-MAX package from Power Curbers allows the 5700 machine to pave wider and higher forms than before. This operation involves the construction of new concrete kerbs and
February 22, 2012 Read time: 1 min
A new 307 Power Curbers 5700-C-MAX machine is being used on a slipforming project in Tampa, Florida in the USA. The project involves major upgrades to the road link, which is being widened from two lanes to four, with two lanes in either direction. The C-MAX package from Power Curbers allows the 5700 machine to pave wider and higher forms than before. This operation involves the construction of new concrete kerbs and gutters on the road. The machine is proving highly productive and reliable in the operation.

For more information on companies in this article

Related Content

  • D-Drill cuts it at 45 degrees with its new machine, D-Kerb
    October 16, 2015
    The D-Kerb, a new machine that cuts granite kerbs to 45° without removing them, has just completed several road projects in London. Local authorities and highways maintenance crew no longer have the cost or inconvenience of replacing them completely, said Julie White, managing director of the company D-Drill and also a co-inventor of the D-Kerb machine. During a highways project in Offord Road, North London, technicians from D-Drill carried out the 45° cut of kerbs around the 45m circumference of a central
  • New Russian bridge link spanning Vistula
    November 4, 2020
    A new Russian bridge link is planned spanning the Vistula Lagoon.
  • New methods for non-destructive concrete testing
    August 29, 2017
    How best is it possible to assess the state of concrete in a road pavement, bridge deck or tunnel wall? One of the most reliable ways is to take a core of concrete from the structure to analyse and test in the laboratory. One downside to this method is that doing the test creates weak points in the structure that must then be repaired. Another is that the frequency of such cores cannot be too great – so it is possible that some problem areas will be missed. New technologies from the world of geospatial eng
  • British Tunnelling Society conference: digging deep for data
    December 13, 2016
    Tunnelling innovation is creating mountains of data for contractors and designers, delegates to a recent British Tunnelling Society (BTS) conference heard Successful innovation in tunnelling techniques and technologies is creating more and more data, thanks to digitalisation.