Skip to main content

Positional couplers speed concrete reinforcement

Hy-Ten's new positional couplers are said to speed up site construction times by using reverse cut threads to link together both reinforcement bars by turning the sleeve in one direction. Richard Webster, director at Hy-Ten, said: "We launched our standard range of friction welded couplers just 12 months ago and the concept has been enthusiastically accepted by both engineers and contractors. The new positional couplers extend the application of this concept into areas where reinforcement bars are immovabl
April 16, 2012 Read time: 2 mins
The new couplers from Hy-Ten offer long life and durability.

Hy-Ten's new positional couplers are said to speed up site construction times by using reverse cut threads to link together both reinforcement bars by turning the sleeve in one direction

Richard Webster, director at 4896 Hy-Ten, said: "We launched our standard range of friction welded couplers just 12 months ago and the concept has been enthusiastically accepted by both engineers and contractors. The new positional couplers extend the application of this concept into areas where reinforcement bars are immovable."

Friction welding is said by Hy-Ten to be a new concept in construction, but the technology has been used in aerospace and automotive applications, where joints formed by this method are subject to extreme stress and high workload.

Hy-Ten said its machines securely hold the bar while rotating the coupler at high speed so that the mating surfaces plasticise and achieve a low fusing temperature, creating a joint that is far stronger than those derived from conventional welding.

The new HT (P) and HT (EP) couplers in the 16mm and 40mm diameter range have been fully tested and certi ed by CARES, the certi cation authority for reinforcement steel.

For more information on companies in this article

Related Content

  • Major Pisa link gets upgrade
    February 29, 2012
    Recycling with foamed bitumen is being used for lane reconstruction on the SP11 road in Italy, where contractor F.lli Lepri is carrying out work on a 14km section. The SP11 is an important link forming part of the Colline per Legoli Highway connecting the SS67 Tosco-Romagnola Highway near Pontedera with the southeast region of Pisa Province up to the borders of Florence Province.
  • Safety barriers deliver valuable road user protection
    February 14, 2012
    Safety barriers provide an invaluable service for all road users, Mike Woof reports The safety barrier market is a key one for the highway sector, with systems providing valuable protection for all categories of road users. The importance of passive protective devices such as safety barriers can often be overlooked by the road user but is well-understood by highway designers. Redirecting an errant vehicle back into the roadway and preventing it from crossing into traffic flowing in the other direction or fr
  • Data collection key to software developments
    February 13, 2012
    The collection and handling of data are key technology drivers in the software sector. New methods of data collection and manipulation are driving significant developments in software at present. The latest technology allows designers and engineers to collect, store and manipulate ever larger amounts of data. Growing use of mobile field equipment for both data collection and field management is driving interactive systems. And in an interview this month Autodesk senior vice-president for the construction an
  • 'Blinding success' at Welsh quarry
    February 14, 2012
    Wales is renowned for many things but dry weather is not one of them. A combination of being close to the Atlantic and having lots of mountains means that it rains a lot and this is bad news when fine screening limestone using conventional steel wire mesh, which tends to clog and blind over in damp weather.