Skip to main content

Positional couplers speed concrete reinforcement

Hy-Ten's new positional couplers are said to speed up site construction times by using reverse cut threads to link together both reinforcement bars by turning the sleeve in one direction. Richard Webster, director at Hy-Ten, said: "We launched our standard range of friction welded couplers just 12 months ago and the concept has been enthusiastically accepted by both engineers and contractors. The new positional couplers extend the application of this concept into areas where reinforcement bars are immovabl
April 16, 2012 Read time: 2 mins
The new couplers from Hy-Ten offer long life and durability.

Hy-Ten's new positional couplers are said to speed up site construction times by using reverse cut threads to link together both reinforcement bars by turning the sleeve in one direction

Richard Webster, director at 4896 Hy-Ten, said: "We launched our standard range of friction welded couplers just 12 months ago and the concept has been enthusiastically accepted by both engineers and contractors. The new positional couplers extend the application of this concept into areas where reinforcement bars are immovable."

Friction welding is said by Hy-Ten to be a new concept in construction, but the technology has been used in aerospace and automotive applications, where joints formed by this method are subject to extreme stress and high workload.

Hy-Ten said its machines securely hold the bar while rotating the coupler at high speed so that the mating surfaces plasticise and achieve a low fusing temperature, creating a joint that is far stronger than those derived from conventional welding.

The new HT (P) and HT (EP) couplers in the 16mm and 40mm diameter range have been fully tested and certi ed by CARES, the certi cation authority for reinforcement steel.

For more information on companies in this article

Related Content

  • New software makes road marking applications easier
    February 17, 2012
    Equipment, materials and testing combine to offer motorists better road markings as Patrick Smith reports Drivers realise that clear road markings, particularly in darkness and during the wet, are life-savers, offering guidance and direction. Manufacturers of marking materials, in-road studs, and testing and laying equipment have spent years perfecting solutions to make such markings easier to place; easier to see through the use of a variety of materials, and longer lasting. Sophisticated testing equip
  • Almost gone: Canada’s old Port Mann Bridge deconstructed
    August 14, 2015
    Three years ago a welder’s cut halved Canada’s old Port Mann Bridge. David Arminas reports from the banks of the Fraser River. By the time this issue of World Highways reaches you, one of Canada’s iconic steel arch bridges will be a shadow of its former self. It’s been a three-year demolition job since the first cut across the deck of the old Port Mann Bridge just outside the city of Vancouver on Canada’s Pacific coast. A new 10-lane 2.2km Port Mann Bridge opened in 2012 (see box). It runs parallel to the o
  • Hamm’s Dr Stefan Klumpp explains future of autonomous compaction
    December 20, 2016
    Autonomous vehicles that can move around without human intervention are not yet a part of everyday life, but they are almost within reach.
  • Solving congestion in Brisbane
    August 2, 2012
    Rapid growth in a major Australian city in recent years has created new problems for the infrastructure and especially transport Expansion in the city of Brisbane, the Queensland state capital and the third largest city in the country, is set to continue and some 1,500 people arrive/week from within Australia and from other parts of the world. At this rate by 2026 the city's population should increase by 1.4 million: at present it is 1.8 million. To cope, the Queensland government and city council have ini