Skip to main content

Positional couplers speed concrete reinforcement

Hy-Ten's new positional couplers are said to speed up site construction times by using reverse cut threads to link together both reinforcement bars by turning the sleeve in one direction. Richard Webster, director at Hy-Ten, said: "We launched our standard range of friction welded couplers just 12 months ago and the concept has been enthusiastically accepted by both engineers and contractors. The new positional couplers extend the application of this concept into areas where reinforcement bars are immovabl
April 16, 2012 Read time: 2 mins
The new couplers from Hy-Ten offer long life and durability.

Hy-Ten's new positional couplers are said to speed up site construction times by using reverse cut threads to link together both reinforcement bars by turning the sleeve in one direction

Richard Webster, director at 4896 Hy-Ten, said: "We launched our standard range of friction welded couplers just 12 months ago and the concept has been enthusiastically accepted by both engineers and contractors. The new positional couplers extend the application of this concept into areas where reinforcement bars are immovable."

Friction welding is said by Hy-Ten to be a new concept in construction, but the technology has been used in aerospace and automotive applications, where joints formed by this method are subject to extreme stress and high workload.

Hy-Ten said its machines securely hold the bar while rotating the coupler at high speed so that the mating surfaces plasticise and achieve a low fusing temperature, creating a joint that is far stronger than those derived from conventional welding.

The new HT (P) and HT (EP) couplers in the 16mm and 40mm diameter range have been fully tested and certi ed by CARES, the certi cation authority for reinforcement steel.

For more information on companies in this article

Related Content

  • Speed and precision make for perfect tunnelling combination
    May 21, 2014
    Speed and precision have been the hallmarks of a number of major road tunnelling projects across the globe over the last 12 months, as the latest sector equipment from leading manufacturers has found itself in high demand. Guy Woodford reports Herrenknecht tunnel boring machines (TBM) have been busy tunnelling under major Chinese rivers, demonstrating phenomenal speed, top safety levels and extreme precision while playing a key role in the construction of road tunnels in the Yangtze River Delta. The Yang
  • New equipment for materials testing
    January 13, 2014
    Leading formwork manufacturers have secured some impressive contracts in Africa, as the continent’s transport infrastructure continues to improve at a rapid pace. Meanwhile, other bridgework equipment companies are also seeing their products in demand in Africa, as well as North America and Australia. Guy Woodford reports
  • Italy's strategic tunnel link
    August 21, 2012
    The world's largest tunnelling machine is completing Italy's important road connection between Bologna and Florence - Adrian Greeman reports For just under a decade a huge programme of highway construction has been underway in the mountainous region between Bologna and Florence, realigning a section of the A1 highway nearly 70km long. The new section, through major tunnels and across high viaducts, will greatly increase capacity on Italy's most important highway.
  • New concrete testing technologies improve speed, safety and quality
    July 8, 2016
    Developments in data processing and management are revolutionising the way concrete strengths can be measured and used to improve efficiencies - Kristina Smith reports on two new technologies A new system that uses thermal imaging to measure the strength of sprayed concrete tunnel linings is being trialled for the first time in London. The brainchild of Dr Benoit Jones, managing director of Inbye Engineering, the technique could lead to improvements in safety, quality and – in the longer run – productivi