Skip to main content

Pervious concrete improves storm water drainage

MINNESOTA CITIES including Minneapolis and Richfield have been testing pervious concrete on parking lots and other hard surfaces to improve storm water management. In Shoreview MN, the authorities went a stage further by opting to replace a storm drainage system with pervious concrete.
April 10, 2012 Read time: 2 mins
North County Concrete set up its Allen Triple Roller Tube Paver to pave the full width streets in one pass
MINNESOTA CITIES including Minneapolis and Richfield have been testing pervious concrete on parking lots and other hard surfaces to improve storm water management. In Shoreview MN, the authorities went a stage further by opting to replace a storm drainage system with pervious concrete. The project includes the reconstruction of five streets in the Woodbridge neighbourhood totalling around 1.6km of pervious concrete streets. Local firm 1230 Cemstone supplied the 1,412m3 of pervious concrete for this project. The pervious concrete was paved 178mm thick and 6.4m wide between two surmountable kerbs. The pervious concrete was placed over 457mm of crushed aggregate base which will allow the storm water to drain through the pervious concrete and filter through the aggregate before re-entering the soil beneath. The job was awarded to North Country Concrete, which decided to use an Allen Model 255CD Triple Roller Tube Paver from 156 Allen Engineering. The paver has a strike-off tube that continuously pushes the excess concrete in front of the machine and two full length drive roller tubes for compaction. The strike-off tube has a vertical adjustment which was set at 19mm above finish grade and the contractor explained that this allowed the machine to achieve high compaction, boosting the durability of the pavement.

For more information on companies in this article

Related Content

  • Cost effective road maintenance
    February 8, 2012
    Highway maintenance and repair is an easy target for cuts in highway budgets, but there are cost-effective measures that can be adopted as Patrick Smith reports. Road maintenance is an increasingly important industry that spans a worldwide market. Awareness of the need for a stable and sustainable international infrastructure, maintenance and creative rural road technologies are taking a stronger role as viable sources for a cost-effective means of preserving, developing and prolonging the life of roads wit
  • Tunnelling challenge on German project
    June 13, 2012
    A massive construction project has been underway deep in the heart of the Schnecktal valley area in Germany. From the surface, though, you would never be able to tell. The majority of the work is underground, as a joint-venture team led by German contractor Wayss and Freytag Ingenieurbau builds the nearly 7km long Finne Tunnel. After a few years of tunnel boring operations, the contractor is at work finishing the interior of the tunnel, slipforming first the tunnel’s floor and then a walkway with its GOMACO
  • Highway widening project for the US
    April 19, 2018
    A highway widening project in the US state of New Hampshire is being assisted by the use of a gravity-fed asphalt paver. The widening work is being carried out as part of an upgrade for a 32km stretch of I-93, which was started eight years ago. The work is being carried out for the New Hampshire Department of Transportation (NHDOT) on a section of the highway between Exits 1 and 5 from the Massachusetts Stateline to Manchester, NH. According to NHDOT, the project involves widening I-93 from two lanes in
  • Surface quality a key trend in asphalt paving
    March 7, 2012
    Improved surface quality and improved machine design are key trends in the asphalt paving sector, Mike Woof reports There is a big difference in asphalt paving techniques in North America and Europe. In North America, the need to construct long stretches of highway quickly resulted in wide pavers offering high throughput capacity, with compaction equipment then being used to achieve the required density of the various courses. In Europe's highway construction projects, distances tend to be shorter and contr