Skip to main content

Paving versatility

Guntert & Zimmerman is offering a new system of telescopic end sections for its concrete pavers, which allow contractors to change widths between pours. These are also said to meet tight smoothness specifications and allow a contractor to carry out width changes quickly.
February 15, 2012 Read time: 1 min
Extra versatility is claimed for the G&Z slip form pavers that can now befitted with the firm's latest telescopic end section option
Guntert & Zimmerman is offering a new system of telescopic end sections for its concrete pavers, which allow contractors to change widths between pours. These are also said to meet tight smoothness specifications and allow a contractor to carry out width changes quickly. The units offer an additional 1.8m for both the G&Z S850 and S1500 slipform pavers.

The firm says that a width change which could typically take a four person crew no less than a full day can now be performed by one or two people in two hours. The new end sections can be specified as an option during the purchase of a new G&Z Slipform Paver or can be retrofitted to existing G&Z machines. The units are also available as an option on the firm's new S600 Multi-Purpose slipform paver.

Related Content

  • Surface quality a key trend in asphalt paving
    March 7, 2012
    Improved surface quality and improved machine design are key trends in the asphalt paving sector, Mike Woof reports There is a big difference in asphalt paving techniques in North America and Europe. In North America, the need to construct long stretches of highway quickly resulted in wide pavers offering high throughput capacity, with compaction equipment then being used to achieve the required density of the various courses. In Europe's highway construction projects, distances tend to be shorter and contr
  • Guntert & Zimmerman develops novel paver control system
    January 6, 2017
    A major launch from Guntert & Zimmermann is of its sophisticated equipment guidance and operation network (EGON), an advanced Plus+1 operator control system. The package is said to incorporate user friendly operator features and state of the art network controllers. The EGON system is similar to the control packages available with rival pavers, and is said to be easy and quick to use.
  • Guntert & Zimmerman develops novel paver control system
    February 8, 2013
    A major launch from Guntert & Zimmermann is of its sophisticated equipment guidance and operation network (EGON), an advanced Plus+1 operator control system. The package is said to incorporate user friendly operator features and state of the art network controllers. The EGON system is similar to the control packages available with rival pavers, and is said to be easy and quick to use.
  • Tunnelling challenge on German project
    June 13, 2012
    A massive construction project has been underway deep in the heart of the Schnecktal valley area in Germany. From the surface, though, you would never be able to tell. The majority of the work is underground, as a joint-venture team led by German contractor Wayss and Freytag Ingenieurbau builds the nearly 7km long Finne Tunnel. After a few years of tunnel boring operations, the contractor is at work finishing the interior of the tunnel, slipforming first the tunnel’s floor and then a walkway with its GOMACO