Skip to main content

New runway for Philippines airport

SunWest Construction Development Corporation has been using a concrete paver from Power Pavers at the new Bicol International Airport in the Philippines. The machine has been used to pave a runway, taxiways, and aprons for the US$105 million project underway in the Daraga municipality of Albay province in the Bicol Region. The new facility has been built as a replacement to the single runway Legazpi airport, which is located in an urban area where future expansion is not possible. SunWest used its Powe
October 1, 2018 Read time: 2 mins
The new Bicol International Airport in the Philippines will offer increased capacity and better safety
SunWest Construction Development Corporation has been using a concrete paver from 3975 Power Pavers at the new Bicol International Airport in the Philippines.


The machine has been used to pave a runway, taxiways, and aprons for the US$105 million project underway in the Daraga municipality of Albay province in the Bicol Region. The new facility has been built as a replacement to the single runway Legazpi airport, which is located in an urban area where future expansion is not possible.

SunWest used its Power Paver SF-2700 to pave a total width of 45m for the new Bicol runway. The SF-2700 was set at a width of 6m and the runway was paved in six lanes. The firm then changed the paver width to 4.5m and added the shoulder onto each side of the runway. A belt finisher was used on the back of the SF-2700 to produce a smooth finish.

The runway is 2.1km long and 400mm deep, and took 37,800m3 of concrete to pour. The mix design for the runway paving included sand from the Mayon Volcano, and 102mm river stone, and 9.5mm, 19mm, and 25mm crushed stone with a 25>40mm slump.

The new airport is a short distance from the city of Legazpi, but unlike the older facility it is not surrounded by buildings. It will be able to accommodate larger aircraft and more passengers, and has room for long-term expansion.

For more information on companies in this article

Related Content

  • Building Egypt's world class Desert Highway
    May 3, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports. The work to upgrade the Desert Highway connecting Egypt's sprawling capital Cairo with its major port Alexandria, is one of the country's largest infrastructure projects for many years. This 220km highway link is being widened and improved to cope with the hugely increased traffic volumes resulting partly from Egypt's fast growing vehicle population. The Egyptian economy is strong
  • Building Egypt's world class Desert Highway
    April 13, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports. The work to upgrade the Desert Highway connecting Egypt's sprawling capital Cairo with its major port Alexandria, is one of the country's largest infrastructure projects for many years. This 220km highway link is being widened and improved to cope with the hugely increased traffic volumes resulting partly from Egypt's fast growing vehicle population. The Egyptian economy is strong
  • A Doosan DX530LC-5 gets its water wings
    January 24, 2019
    German contractor Kieswerke Silzen Peissen has purchased three new Doosan machines for the company’s Silzen-based operations for gravel extraction above and below water. The new machines comprise the Doosan DL420-5 wheeled loader, a custom-made long-reach 60 tonne DX530LC-5 excavator and the state-of-the-art wheeledloader DL420CVT-5, with CVT, denoting a continuously variable transmission. Silzen Peissen’s two plants in Silzen comprise about 70ha of approved mining area, of which around 20ha - called Plan
  • Historic Oakland Bay Bridge receives a new asphalt road surface
    March 31, 2014
    Part of an iconic US bridge has been given a new lease of life, as Mike Woof reports The western section of the historic Oakland Bay Bridge in the US state of California has recently benefited from a series of improvements to strengthen its structural integrity and also upgrade the running surface. Contractor OC Jones & Sons of Berkeley CA, paved large portions of the bridge, taking on two different projects as part of the work. First was placement of the specialised epoxy on the self-anchored suspension (S