Skip to main content

New runway for Philippines airport

SunWest Construction Development Corporation has been using a concrete paver from Power Pavers at the new Bicol International Airport in the Philippines. The machine has been used to pave a runway, taxiways, and aprons for the US$105 million project underway in the Daraga municipality of Albay province in the Bicol Region. The new facility has been built as a replacement to the single runway Legazpi airport, which is located in an urban area where future expansion is not possible. SunWest used its Powe
October 1, 2018 Read time: 2 mins
The new Bicol International Airport in the Philippines will offer increased capacity and better safety
SunWest Construction Development Corporation has been using a concrete paver from 3975 Power Pavers at the new Bicol International Airport in the Philippines.


The machine has been used to pave a runway, taxiways, and aprons for the US$105 million project underway in the Daraga municipality of Albay province in the Bicol Region. The new facility has been built as a replacement to the single runway Legazpi airport, which is located in an urban area where future expansion is not possible.

SunWest used its Power Paver SF-2700 to pave a total width of 45m for the new Bicol runway. The SF-2700 was set at a width of 6m and the runway was paved in six lanes. The firm then changed the paver width to 4.5m and added the shoulder onto each side of the runway. A belt finisher was used on the back of the SF-2700 to produce a smooth finish.

The runway is 2.1km long and 400mm deep, and took 37,800m3 of concrete to pour. The mix design for the runway paving included sand from the Mayon Volcano, and 102mm river stone, and 9.5mm, 19mm, and 25mm crushed stone with a 25>40mm slump.

The new airport is a short distance from the city of Legazpi, but unlike the older facility it is not surrounded by buildings. It will be able to accommodate larger aircraft and more passengers, and has room for long-term expansion.

For more information on companies in this article

Related Content

  • Bauma Conexpo India 2016 – show report
    March 6, 2017
    The fourth edition of Bauma Conexpo India, which took place at Gurugram, near New Delhi, was dominated by road construction manufacturers and distributors, sharing heightened business confidence and buoyed by the Indian government's major thrust to develop road infrastructure. Partha Pratim Basistha reports
  • High performance pavers build high performance track
    February 29, 2012
    Work on the new Formula 1 racing circuit in Abu Dhabi is progressing at high speed. Over 6,000 construction personnel are working in the United Arab Emirates (UAE) to complete the new high-speed circuit and its infrastructure. German contractor Bickhardt-Bau is carrying out the paving work, using a fleet of new Vögele pavers and Hamm compaction rollers.
  • Sri Lanka Airport runway upgrade
    December 7, 2017
    Sri Lanka’s main international airport now features a new runway surface that will help improve air transport efficiency at the facility The project was carried out successfully, despite a tough time schedule, boosting safety at the airport. This new runway will help increase capacity at the airport, allowing Sri Lanka to develop the tourist sector on which the country depends heavily for its economic growth. The work at the international airport for Sri Lanka’s capital Colombo was carried out with the
  • Runway rebuild for key Bulgarian airport
    August 21, 2013
    Varna Airport in north-east Bulgaria provides an important international link for the country, with a runway rebuild helping improve capacity. The airport is of particular importance for Bulgaria’s tourist trade as it provides a major connection for visitors to the Black Sea coast. And the reconstruction work at Varna Airport’s only runway will ensure the facility is able to handle the area’s increasing visitor numbers. The project had to be carried out quickly and efficiently to prevent delays to f