Skip to main content

New runway for Philippines airport

SunWest Construction Development Corporation has been using a concrete paver from Power Pavers at the new Bicol International Airport in the Philippines. The machine has been used to pave a runway, taxiways, and aprons for the US$105 million project underway in the Daraga municipality of Albay province in the Bicol Region. The new facility has been built as a replacement to the single runway Legazpi airport, which is located in an urban area where future expansion is not possible. SunWest used its Powe
October 1, 2018 Read time: 2 mins
The new Bicol International Airport in the Philippines will offer increased capacity and better safety
SunWest Construction Development Corporation has been using a concrete paver from 3975 Power Pavers at the new Bicol International Airport in the Philippines.


The machine has been used to pave a runway, taxiways, and aprons for the US$105 million project underway in the Daraga municipality of Albay province in the Bicol Region. The new facility has been built as a replacement to the single runway Legazpi airport, which is located in an urban area where future expansion is not possible.

SunWest used its Power Paver SF-2700 to pave a total width of 45m for the new Bicol runway. The SF-2700 was set at a width of 6m and the runway was paved in six lanes. The firm then changed the paver width to 4.5m and added the shoulder onto each side of the runway. A belt finisher was used on the back of the SF-2700 to produce a smooth finish.

The runway is 2.1km long and 400mm deep, and took 37,800m3 of concrete to pour. The mix design for the runway paving included sand from the Mayon Volcano, and 102mm river stone, and 9.5mm, 19mm, and 25mm crushed stone with a 25>40mm slump.

The new airport is a short distance from the city of Legazpi, but unlike the older facility it is not surrounded by buildings. It will be able to accommodate larger aircraft and more passengers, and has room for long-term expansion.

For more information on companies in this article

Related Content

  • Hot work for GOMACO at Doha airport
    November 2, 2012
    The country of Qatar, located on the Persian Gulf, developed a master plan to build a new replacement airport in its capital city of Doha, the New Doha International Airport, in 2003. Its goal is to have a facility capable of handling 50 million passengers; two million tons (1.8million tonnes) of cargo, and 320,000 aircraft landings and take-offs each year by 2015. Phase one of the aggressive project is scheduled for completion early next year. The Tayseeir Contractors Company Joint Venture, including Conso
  • Atlanta airport’s new apron
    October 12, 2012
    The new Maynard H Jackson Jr International Terminal at Hartsfield- Jackson Atlanta International Airport is now open for business. The 111,484m2 terminal features 12 gates, eight security checkpoints, separate levels for arrivals and departures, as well as a 148,831m2 concrete apron for aircraft to park on arrival. Archer Western won the contract to slipform the concrete apron, replace the existing Taxiway D, as well as other utilities and embankment work. The firm brought in one of its GOMACO paving trains
  • Wirtgen group machines flying high at İstanbul Yeni Havalimanı
    May 21, 2018
    Plant and machines from Wirtgen, Vögele, Hamm and Benninghoven are playing a vital part in the construction of Istanbul’s new airport . Istanbul’s new airport is Turkey’s biggest infrastructure project ever. It is also expected to become the world's largest airport by estimated passenger numbers.
  • Concrete runway surface for Indonesian airport
    May 14, 2020
    The new Yogyakarta International Airport in Indonesia is seeing the benefit of a high-quality runway surface. The runway was built quickly and efficiently to a high standard, using the latest equipment. In all, 11 slipform pavers from Wirtgen played a key role in the airport’s construction.