Skip to main content

Minnich machines helping upgrade Venice airport

The Marco Polo Airport, which serves the Italian city of Venice, is in the midst of a major upgrade to boost capacity. The work is being handled by the SAVE Group and involves a €630 million expansion and renovation of the facilities. This will increase capacity with one major phase of the plan being the 2015-16 extension of the apron. This challenging task has been tackled by NORDPAVI, an Italian concrete contractor that specialises in airport work. The firm is based in Bolzano in Italy’s South Tyrol an
September 13, 2016 Read time: 3 mins
Minnich equipment handled the dowel pin drilling work at Venice airport
The Marco Polo Airport, which serves the Italian city of Venice, is in the midst of a major upgrade to boost capacity. The work is being handled by the SAVE Group and involves a €630 million expansion and renovation of the facilities. This will increase capacity with one major phase of the plan being the 2015-16 extension of the apron. This challenging task has been tackled by NORDPAVI, an Italian concrete contractor that specialises in airport work.

The firm is based in Bolzano in Italy’s South Tyrol and was awarded the job of slipform paving a 45,000m2 concrete apron at the airport. The company runs a 218 GOMACO slipformer in its equipment fleet. NORDPAVI airport development manager Enrico Dal Farra said that its key concerns for the work included addressing concrete supply and job-site access during the €562,000 project. Dowel-pin drill selection would be crucial to productivity and profitability.

“Security and traffic safety are critical on airport jobs,” Dal Farra said. “Because we had strict terms to respect, it was very important to have efficient and accurate equipment on the site that could be relied on. For example, it’s a major problem if we have to stop work because a dowel-pin drill doesn’t work or the dowels aren’t aligned.”

The project would require more than 16,000 dowel-pin holes 30mm in diameter to be drilled to depths of 500mm. NORDPAVI wanted to use a dowel-pin drill that delivered more than just superior speed and accuracy. Worker safety is the top priority at NORDPAVI, so operator safety features would also dictate drill selection.

NORDPAVI co-owners, partners and brothers Christian and Luca Da Canal decided to use an A-4SCW on-slab self-propelled wireless unit from 286 Minnich Manufacturing, to handle the dowel-pin drilling work.

According to Dal Farra, the Minnich A-4SCW’s wireless remote control technology enabled NORDPAVI operators to drill eight holes/minute and drive down the slab to drill the next set of holes, while standing in the grade away from the equipment. He explained that from that location, operators could drill faster and more accurately while avoiding excess dust and obstacles.

With the help of its Minnich drill, NORDPAVI completed its portion of the project on time in spring 2016.

For more information on companies in this article

Related Content

  • Concrete surface for runway paving job
    January 18, 2016
    The Fort Lauderdale-Hollywood International Airport in Broward County, Florida, was suffering departure delays on every single flight. The existing 9R-27L runway was too short at 1615m in length, affecting capacity at the airport. To deal with the issue, the Broward County Board of County Commissioners created a plan to extend the southern runway to 2438m to accommodate larger commercial aircraft. The project was not simple however and could not be achieved by tearing out the existing runway and buil
  • Special concrete paver for UK road job
    January 5, 2015
    A specially adapted Wirtgen SP25i concrete slipformer has been used on the M6 motorway near Cannock in the UK. The machine worked together with a Wirtgen ISF25i (independent side feeder) in order to pave a concrete slab under difficult conditions. With an overall length of 373km, the M6 is the longest and one of the most heavily congested motorways in the UK. The M6 connects the M1 motorway near Rugby with Carlisle near the Scottish border. But due to the steadily growing volume of traffic, the Highways
  • Concrete runway paving in the US
    December 15, 2017
    A new Wirtgen SP 94i slipform paver has helped deliver the successful reconstruction of a runway in the US state of Missouri. With more than 30,000 take-offs and landings a year, Jefferson City Memorial Airport (JEF) is one of the most heavily frequented airports in Missouri. Thousands of visitors travel through it every day on their way to the government and congress offices in the state capital on the Missouri River. At the end of April 2016, work commenced on the reconstruction of a runway approximately
  • G&Z paving Canada’s longest runway
    October 12, 2012
    A contractor in Canada, Dufferin Construction, is using three items of new equipment bought from Guntert & Zimmerman to pave the country’s longest runway. The project is extensive, featuring a new runway measuring 4.3km long by 60m wide, an apron area measuring 145,000m2 and two taxiways, each 3.8km long by 25m wide. In all, the work requires 1.5 million tonnes of base aggregate, and 200,000m2 of cement-stabilised base. Dufferin Construction Company, a division of Holcim (Canada) already owns two other G&Z