Skip to main content

Minnich machines helping upgrade Venice airport

The Marco Polo Airport, which serves the Italian city of Venice, is in the midst of a major upgrade to boost capacity. The work is being handled by the SAVE Group and involves a €630 million expansion and renovation of the facilities. This will increase capacity with one major phase of the plan being the 2015-16 extension of the apron. This challenging task has been tackled by NORDPAVI, an Italian concrete contractor that specialises in airport work. The firm is based in Bolzano in Italy’s South Tyrol an
September 13, 2016 Read time: 3 mins
Minnich equipment handled the dowel pin drilling work at Venice airport
The Marco Polo Airport, which serves the Italian city of Venice, is in the midst of a major upgrade to boost capacity. The work is being handled by the SAVE Group and involves a €630 million expansion and renovation of the facilities. This will increase capacity with one major phase of the plan being the 2015-16 extension of the apron. This challenging task has been tackled by NORDPAVI, an Italian concrete contractor that specialises in airport work.

The firm is based in Bolzano in Italy’s South Tyrol and was awarded the job of slipform paving a 45,000m2 concrete apron at the airport. The company runs a 218 GOMACO slipformer in its equipment fleet. NORDPAVI airport development manager Enrico Dal Farra said that its key concerns for the work included addressing concrete supply and job-site access during the €562,000 project. Dowel-pin drill selection would be crucial to productivity and profitability.

“Security and traffic safety are critical on airport jobs,” Dal Farra said. “Because we had strict terms to respect, it was very important to have efficient and accurate equipment on the site that could be relied on. For example, it’s a major problem if we have to stop work because a dowel-pin drill doesn’t work or the dowels aren’t aligned.”

The project would require more than 16,000 dowel-pin holes 30mm in diameter to be drilled to depths of 500mm. NORDPAVI wanted to use a dowel-pin drill that delivered more than just superior speed and accuracy. Worker safety is the top priority at NORDPAVI, so operator safety features would also dictate drill selection.

NORDPAVI co-owners, partners and brothers Christian and Luca Da Canal decided to use an A-4SCW on-slab self-propelled wireless unit from 286 Minnich Manufacturing, to handle the dowel-pin drilling work.

According to Dal Farra, the Minnich A-4SCW’s wireless remote control technology enabled NORDPAVI operators to drill eight holes/minute and drive down the slab to drill the next set of holes, while standing in the grade away from the equipment. He explained that from that location, operators could drill faster and more accurately while avoiding excess dust and obstacles.

With the help of its Minnich drill, NORDPAVI completed its portion of the project on time in spring 2016.

For more information on companies in this article

Related Content

  • Improved runways for Jeddah International Airport
    August 21, 2013
    With an increasing number of aircraft using Jeddah International Airport in Saudi Arabia, the authorities realised there was a need to upgrade the facilities. King Abdulaziz International Airport opened in 1982 and serves over 15 million passengers/year, with a high percentage travelling on the annual Islamic pilgrimage to Mecca, some 80km away. The city has the largest port on the Red Sea and is named after Abd al-Aziz ibn Saud, the former king and founding father of Saudi Arabia, and is one of the kin
  • Upgrades by Power Pavers ensure old generation slipformer uses new Topcon machine control system
    July 1, 2013
    Upgrades to a slipform concrete paver built in 1999 allow it to use current technology. US firm Streb Construction has taken a novel approach to its paving fleet by upgrading a CMI paver built in 1999 to use modern machine control technology. The company bought the CMI SF3302 machine new and this piece of equipment had logged a high number of hours since its purchase. However the company realised that this proven piece of equipment could be made to operate more efficiently and productively, as well as more
  • Versatile concrete paving machines
    July 13, 2012
    Concrete paving machines from Guntert & Zimmerman have been carrying out important surface repair jobs around the world. In Belgium a paver from the firm recently completed a high speed road repair, while at Qatar's New Doha International airport one of the firm's S850 units has carried out a major apron paving contract. The new airport is being designed to cope with large passenger aircraft such as the Airbus A380 and the Sinohydro-Gamuda-WCT joint venture was awarded the contract to build two runways, thr
  • Concrete paving key to Berlin's airport runways
    February 17, 2012
    High production concrete paving is proving a key feature at the new Berlin airport facility currently under construction The new Berlin-Brandenburg International Airport will soon provide improved links by air to the city. Work started in mid 2006 with the redevelopment of the existing Berlin Schönefeld Airport.