Skip to main content

Minnich machines helping upgrade Venice airport

The Marco Polo Airport, which serves the Italian city of Venice, is in the midst of a major upgrade to boost capacity. The work is being handled by the SAVE Group and involves a €630 million expansion and renovation of the facilities. This will increase capacity with one major phase of the plan being the 2015-16 extension of the apron. This challenging task has been tackled by NORDPAVI, an Italian concrete contractor that specialises in airport work. The firm is based in Bolzano in Italy’s South Tyrol an
September 13, 2016 Read time: 3 mins
Minnich equipment handled the dowel pin drilling work at Venice airport
The Marco Polo Airport, which serves the Italian city of Venice, is in the midst of a major upgrade to boost capacity. The work is being handled by the SAVE Group and involves a €630 million expansion and renovation of the facilities. This will increase capacity with one major phase of the plan being the 2015-16 extension of the apron. This challenging task has been tackled by NORDPAVI, an Italian concrete contractor that specialises in airport work.

The firm is based in Bolzano in Italy’s South Tyrol and was awarded the job of slipform paving a 45,000m2 concrete apron at the airport. The company runs a 218 GOMACO slipformer in its equipment fleet. NORDPAVI airport development manager Enrico Dal Farra said that its key concerns for the work included addressing concrete supply and job-site access during the €562,000 project. Dowel-pin drill selection would be crucial to productivity and profitability.

“Security and traffic safety are critical on airport jobs,” Dal Farra said. “Because we had strict terms to respect, it was very important to have efficient and accurate equipment on the site that could be relied on. For example, it’s a major problem if we have to stop work because a dowel-pin drill doesn’t work or the dowels aren’t aligned.”

The project would require more than 16,000 dowel-pin holes 30mm in diameter to be drilled to depths of 500mm. NORDPAVI wanted to use a dowel-pin drill that delivered more than just superior speed and accuracy. Worker safety is the top priority at NORDPAVI, so operator safety features would also dictate drill selection.

NORDPAVI co-owners, partners and brothers Christian and Luca Da Canal decided to use an A-4SCW on-slab self-propelled wireless unit from 286 Minnich Manufacturing, to handle the dowel-pin drilling work.

According to Dal Farra, the Minnich A-4SCW’s wireless remote control technology enabled NORDPAVI operators to drill eight holes/minute and drive down the slab to drill the next set of holes, while standing in the grade away from the equipment. He explained that from that location, operators could drill faster and more accurately while avoiding excess dust and obstacles.

With the help of its Minnich drill, NORDPAVI completed its portion of the project on time in spring 2016.

For more information on companies in this article

Related Content

  • Hot work for GOMACO at Doha airport
    November 2, 2012
    The country of Qatar, located on the Persian Gulf, developed a master plan to build a new replacement airport in its capital city of Doha, the New Doha International Airport, in 2003. Its goal is to have a facility capable of handling 50 million passengers; two million tons (1.8million tonnes) of cargo, and 320,000 aircraft landings and take-offs each year by 2015. Phase one of the aggressive project is scheduled for completion early next year. The Tayseeir Contractors Company Joint Venture, including Conso
  • Dust collection can boost safety for concrete drilling
    November 8, 2017
    Enhancing safety by the use of dust collection systems for dowel pin drills - *Rob Minnich. The problem posed by silica dust is a major topic for discussion throughout the US construction industry at present. Enforcement of the Occupational Safety and Health Administration (OSHA) final respirable crystalline silica standard began on September 23rd, 2017, bringing the topic into the mainstream. Although it was developed to protect the health of American workers, the new rule has a much wider significance
  • Atlanta airport’s new apron
    October 12, 2012
    The new Maynard H Jackson Jr International Terminal at Hartsfield- Jackson Atlanta International Airport is now open for business. The 111,484m2 terminal features 12 gates, eight security checkpoints, separate levels for arrivals and departures, as well as a 148,831m2 concrete apron for aircraft to park on arrival. Archer Western won the contract to slipform the concrete apron, replace the existing Taxiway D, as well as other utilities and embankment work. The firm brought in one of its GOMACO paving trains
  • Advances in concrete paving materials
    July 9, 2012
    Innovations in materials technology, as well as machines, could provide a major boost to the concrete paving sector - Mike Woof reports Development of new material technologies for the concrete paving sector continues apace and the latest innovations could provide the biggest boost for this market in many years. High performance cementitious material (HPCM) is an innovative concept that has been developed and tested for road surfacing applications as part of a project in which the UK's Transport Research La