Skip to main content

LafargeHolcim wins Highway 1 deal in Vancouver, Canada

LafargeHolcim has been awarded infrastructure contracts worth more than US$73.5 million as part of a major Highway 1 improvement project in Vancouver, Canada.
July 1, 2019 Read time: 2 mins
Lynn Creek Bridge: LafargeHolcim will use recycled concrete for its TransCanada Highway work near Vancouver, on Canada’s west coast

Highway 1 – also called the TransCanada Highway – is a vital economic link for many local, regional and provincial towns and cities across the country, from the Atlantic to Pacific coasts.

For the work in the Vancouver area, LafargeHolcim will be the prime contractor as awarded by the Ministry of Transportation and Infrastructure for the province of British Columbia. LafargeHolcim will be offering an integrated solution for one of the most sustainable road projects in Canada, said René Thibault, region head North America for the company.

Recycled aggregates that are produced by turning construction and demolition waste into new materials will prevent more than 200,000 tonnes of waste from ending up as landfill. Durability of the concrete will be ensured by adding cementitious material. To further improve quality and reliability, LafargeHolcim also uses sensors within the structural walls of the interchanges which monitor the complete concrete pour. The use of these sensors further reduces construction time thanks to improved formwork stripping.

By using its maritime logistics network in the area, LafargeHolcim said it will move material to site by river barge in order to limit truck movement s and cut down on emissions.

The project is expected to be completed in 2021.

LafargeHolcim, based in Switzerland, employs around 80,000 people in 80 countries, including 6,000 people across 350 sites in Canada. The company’s global portfolio includes aggregates, asphalt and paving, cement, contracting, precast concrete and ready-mix concrete.

 

Related Content

  • Road surfacing: the case for sustainability
    March 5, 2020
    Erik Denneman* makes the social and business case for sustainable pavements for which much of the technology already exists.
  • Ammann is helping boost RAP use in China
    December 19, 2017
    The use of a new Ammann plant is helping to improve RAP usage in China with the manufacturer and the Chinese Government working together to gather and evaluate production data. A key Ammann customer in China is helping pave the way for the expanded use of recycled asphalt pavement (RAP) in the country’s road projects. Tianjin TianHeJianLing Road & Bridge Engineering Technology is a pioneer in the use of RAP in China. The mixes its Ammann ABA UniBatch and Uniglobe asphalt plants produce are being scrutinised
  • New Honduras highway corridor
    September 24, 2014
    Construction is commencing on a new logistics corridor crossing Honduras that will connect the country’s Atlantic and Pacific coasts. Some US$271 million is being spent on the project so far. The highway will feature two lanes in either direction for all of its 391km length. The country aims to boost its economic presence in Central America through this project, which will also help stabilise its economy. The work will cut congestion in key urban areas along the route, as well as improving connections to th
  • Hydrodemolition equipment helps Swiss bridge rebuild
    December 2, 2014
    A highway bridge in Switzerland has been refurbished with help from hydrodemolition equipment supplied by Aquajet The firm’s latest Rotolance 2500 was used alongside an Aquacutter 710 VE evolution on the Viaduc de Chillon link, above Lake Geneva. The machines were used by Zurich-based hydrodemolition specialist contractor, Walo Hydrodynamik, to remove more than 25,000m³ of concrete deck on the bridge.