Skip to main content

LafargeHolcim wins Highway 1 deal in Vancouver, Canada

LafargeHolcim has been awarded infrastructure contracts worth more than US$73.5 million as part of a major Highway 1 improvement project in Vancouver, Canada.
July 1, 2019 Read time: 2 mins
Lynn Creek Bridge: LafargeHolcim will use recycled concrete for its TransCanada Highway work near Vancouver, on Canada’s west coast

Highway 1 – also called the TransCanada Highway – is a vital economic link for many local, regional and provincial towns and cities across the country, from the Atlantic to Pacific coasts.

For the work in the Vancouver area, LafargeHolcim will be the prime contractor as awarded by the Ministry of Transportation and Infrastructure for the province of British Columbia. LafargeHolcim will be offering an integrated solution for one of the most sustainable road projects in Canada, said René Thibault, region head North America for the company.

Recycled aggregates that are produced by turning construction and demolition waste into new materials will prevent more than 200,000 tonnes of waste from ending up as landfill. Durability of the concrete will be ensured by adding cementitious material. To further improve quality and reliability, LafargeHolcim also uses sensors within the structural walls of the interchanges which monitor the complete concrete pour. The use of these sensors further reduces construction time thanks to improved formwork stripping.

By using its maritime logistics network in the area, LafargeHolcim said it will move material to site by river barge in order to limit truck movement s and cut down on emissions.

The project is expected to be completed in 2021.

LafargeHolcim, based in Switzerland, employs around 80,000 people in 80 countries, including 6,000 people across 350 sites in Canada. The company’s global portfolio includes aggregates, asphalt and paving, cement, contracting, precast concrete and ready-mix concrete.

 

Related Content

  • FM Conway and TfL set “benchmark” for RAP use in A40 project
    November 30, 2017
    Infrastructure services company FM Conway and the UK’s Transport for London (TfL) have set “a new benchmark” for recycling in the highways industry.
  • Spencer Group cable access for Pattullo Bridge
    July 3, 2023
    Spencer is working on behalf of Fraser Crossing Constructors GP - a joint venture between Acciona and Aecon - on the suspension bridge near Vancouver, Canada.
  • Highway 407 Revisited – smart tollroad extension
    June 7, 2016
    In the late 1990s, World Highways published a supplement on construction of Canada’s Highway 407, the world’s first all-electronic toll road. But how successful has it been? David Arminas reports from Toronto The head office for 407 ETR Concession Company is a low-rise building next to exit 59, just north of Toronto, Canada’s economic powerhouse. The building may be non-descript but inside is the advanced technical heart of Highway 407 ETR – Express Toll Route. It houses the latest toll monitoring techno
  • India’s capital highway project will improve transport connections
    October 10, 2017
    Huge numbers of construction machines as well as plant and equipment are working overtime, backed by mammoth manpower, to meet the targeted completion deadline of March 2018 for India’s Eastern Peripheral Expressway (EPE). The 135km arterial route is being built with six lanes and surrounds India’s National Capital, Delhi, its National Capital Region (NCR) and the industrially developed North Indian states of Haryana and Uttar Pradesh.