Skip to main content

Highway rebuild

A major contractor In Turkey is using new Dynapac pavers to resurface the busy Istanbul-Ankara highway. Onur Insaat Taahhut bought 12 new Dynapac compactors and pavers at the end of last year and is using two of its new SD135C pavers on the D-100 highway. In all 12 Dynapac asphalt paving machines and vibratory compactors were added to its fleet of equipment, and has put two of the tracked pavers to work on the Ankara to Istanbul link. The machines, four SD135C medium-sized tracked pavers, four CC524HF artic
March 21, 2012 Read time: 2 mins
A major contractor In Turkey is using new 206 Dynapac pavers to resurface the busy Istanbul-Ankara highway.

Onur Insaat Taahhut bought 12 new Dynapac compactors and pavers at the end of last year and is using two of its new SD135C pavers on the D-100 highway. In all 12 Dynapac asphalt paving machines and vibratory compactors were added to its fleet of equipment, and has put two of the tracked pavers to work on the Ankara to Istanbul link.

The machines, four SD135C medium-sized tracked pavers, four CC524HF articulated tandem rollers and four CA282D medium-range vibratory soil compactors, were supplied through Dynapac's distributor for Turkey, 2977 Teknomak Makina. Two of the units were sent to resurface a 30 km stretch of the D-100 highway between Bolu and Gerede, midway between Istanbul and Ankara. The main route between Istanbul and Ankara is the E-80, and this is closely paralleled by the smaller but busy D-100.

Onur's contract involves resurfacing of both 9.6m wide carriageways on a 30km length of the D-100, the contractor working on one carriageway at a time, closing a stretch of about 1km to cause the least disruption to the traffic. The two SD135C units have a maximum working width of 10m and are being used to place an asphalt course that has a final thickness of 140mm, the compaction being carried out by two existing Dynapac CC524HF compactors from Onur's fleet. The firm is laying and compacting of 15,500tonnes of asphalt/day on this project.

For more information on companies in this article

Related Content

  • Dynapac’s compact paver for small job
    March 20, 2019
    Dynapac is introducing a new ultra-compact asphalt paver, for use in small paving jobs. The machine can pave 800mm wide, its narrow width and compact dimensions suiting it to use in reinstatement jobs after utilities work, cycle lane, driveway or pedestrian walkway jobs for example. It can also be used for laying sand and gravel base materials, for later surfacing. The firm says that the machine offers a more productive solution for small paving works than traditional hand finishing methods, while also pro
  • Surface quality a key trend in asphalt paving
    March 7, 2012
    Improved surface quality and improved machine design are key trends in the asphalt paving sector, Mike Woof reports There is a big difference in asphalt paving techniques in North America and Europe. In North America, the need to construct long stretches of highway quickly resulted in wide pavers offering high throughput capacity, with compaction equipment then being used to achieve the required density of the various courses. In Europe's highway construction projects, distances tend to be shorter and contr
  • Speedy airport upgrade
    February 15, 2012
    Increases in flight numbers from the Frankfurt Hahn airport have resulted in necessary improvements to the facility, including new runway surfaces. The former German military airbase has been used as a civilian airport since 1993 but is now Germany's fifth largest air cargo hub and handles some 40,000 flights/year.
  • Sri Lanka Airport runway upgrade
    December 7, 2017
    Sri Lanka’s main international airport now features a new runway surface that will help improve air transport efficiency at the facility The project was carried out successfully, despite a tough time schedule, boosting safety at the airport. This new runway will help increase capacity at the airport, allowing Sri Lanka to develop the tourist sector on which the country depends heavily for its economic growth. The work at the international airport for Sri Lanka’s capital Colombo was carried out with the