Skip to main content

GOMACO helps to reduce Philippines congestion

In the Philippines, a GOMACO GP-2400 concrete paver has been carrying out slipforming work on a project that will help alleviate traffic congestion. CM Pancho Construction Company, based out of Quezon City, Philippines, recently purchased a new GOMACO GP-2400 two-track paver. The firm had previously owned a GOMACO GT-6300 and made the decision to upgrade to a new machine, receiving the new unit earlier this year. The company put its new GP-2400 to work immediately on the Plaridel Bypass Road project near th
November 29, 2012 Read time: 2 mins
AM Pancho Construction Company has slipformed a new traffic lane for the Plaridel Bypass Road project in the Philippines
In the Philippines, a 218 Gomaco GP-2400 concrete paver has been carrying out slipforming work on a project that will help alleviate traffic congestion.

CM Pancho Construction Company, based out of Quezon City, Philippines, recently purchased a new GOMACO GP-2400 two-track paver. The firm had previously owned a GOMACO GT-6300 and made the decision to upgrade to a new machine, receiving the new unit earlier this year.

The company put its new GP-2400 to work immediately on the Plaridel Bypass Road project near the town of Bustos. The project involved building a new 6km long, two-lane highway. In areas, the highway reaches up to four lanes wide. The GP-2400 slipformed the new roadway in paving passes 3.5m wide and 300mm thick.
For this job the paver used a left-hand sidebar inserter. This was used to insert 16mm diameter bars measuring 600mm long every 600mm.

The bypass forms part of the country's 2569 Department of Public Works and Highways' plan to improve mobility and promote development. The bypass will also help ease serious traffic congestion in the Bulacan province and improve accessibility to schools, hospitals, and markets for the people living in the province.

For more information on companies in this article

Related Content

  • Winning formula for formwork
    July 19, 2012
    An unusual application of formwork took place recently in France, while formwork using one particular engineering construction kit was used for the first time in Poland. Guy Woodford reports An 80m long wild game underpass is an innovative feature of the Route Nationale 88 (RN 88) expansion in south-west France. For construction of the arched underpass tunnel, a PERI tunnel formwork carriage using VARIOKIT engineering construction kit was used. Thanks to the equipment’s easy handling, along with pre-assembl
  • Cost-saving benefits of dual layer asphalt paving
    February 14, 2012
    Sophisticated dual layer paving technologies currently on the market are said to offer major advantages to road builders. Roads built using twin layer, hot on hot paving techniques can last considerably longer than those constructed using conventional methods. Contractors and clients also stand to gain from savings on materials costs, through the elimination of the need for emulsion spraying between binder and wearing courses and with the use of thin layer wearing course designs. At present two paver man
  • Volvo CE upgrades key asphalt paver models
    December 13, 2018
    Volvo CE is upgrading its key asphalt paver models with the addition of its latest generation technology. The company is now fitting the sophisticated EPMIII electronic pavement management system to its new generation P6820D. This machine is also equipped with the new PaveAssist package, which allows real-time monitoring of machine parameters. The P6820D replaces the earlier C series machine, with power from the latest generation Volvo D6 engine rated at 140KW, and which meets the Stage IV/Tier 4 Final em
  • Consultation soon for Vancouver area’s Massey Tunnel replacement
    September 19, 2019
    The Canadian province of British Columbia could put options for a Massey Tunnel replacement out to consultation late this year or early next. A statement from the BC ministry of transportation and infrastructure said the government is in discussions with various stakeholders about which options it will put out for consultation. Whatever option is chosen to replace the ageing four-lane Massey Tunnel – be it a bridge or another tunnel – it will be will be either six or eight lanes, according to the gove