Skip to main content

German Autobahn receives new concrete surface

Precision paving performance has been achieved on a major road project in Germany, using Wirtgen slipform pavers. The SP1500 and SP1500L models have been used to help upgrade a stretch of the BAB A9 Autobahn in Thuringia. The BAB A9 Autobahn is one of Germany’s most important roads, connecting the German cities of Berlin and Munich over a total distance of 529km. The route runs from Brandenburg through Saxony-Anhalt, Saxony, Thuringia and into Bavaria.
September 11, 2014 Read time: 3 mins
The contracting team has been using two Wirtgen pavers to lay the top and bottom layers, wet on wet

Precision paving performance has been achieved on a major road project in Germany, using 2395 Wirtgen slipform pavers. The SP1500 and SP1500L models have been used to help upgrade a stretch of the BAB A9 Autobahn in Thuringia.

The BAB A9 Autobahn is one of Germany’s most important roads, connecting the German cities of Berlin and Munich over a total distance of 529km. The route runs from Brandenburg through Saxony-Anhalt, Saxony, Thuringia and into Bavaria.

The 19km widening job for the A9 between Triptis and Schleiz was based for the first time in Germany using a new model of public-private partnership, with payment dependent on the quality of service provided. In practice, any defects in quality and any limitation on availability will result in a reduction of the payment to the operator during the 20-year concession.

To meet the lifetime requirements the consortium carrying out the work, 3281 Eurovia, opted to use concrete surfacing, with a finish designed to reduce surface noise. Concrete offers a high resistance to deformation as well as a high load-bearing capacity able to cope with a high percentage of large trucks, while requiring minimal maintenance.

The work required laying the surface for six motorway lanes extending 19km has required some 165,000m3 of concrete. On the A9 job site, the two Wirtgen pavers laid down the two-layer concrete pavement in just one pass at a rate of around 400-500m/day.

The SP1500L paver laid the subgrade. The 230mm-thick bottom-layer concrete was paved true to line and level and compacted by an internal vibrator, while the machine simultaneously embedded dowels and tie bars in it. This yields a homogeneous base for the 70mm-thick top-layer concrete.

The top-layer concrete is installed immediately after the bottom-layer concrete, so as to ensure optimal interlocking of both layers. The concrete for the top-layer is provided via the bottom-layer concrete paver from a receiving hopper with a charging conveyor and placed in front of the second slipform paver, the SP1500.

The machine then distributes this material across the entire paving width with its spreading plough, installs the top-layer concrete wet-in-wet when passing over it and simultaneously compacts it. The finishing beam and super smoother produce the desired optimum surface finish: during the paving process, a finishing beam is deployed across the roadway while an oscillating super smoother operates in the direction of travel of the paver.

The concrete pavement is additionally sprayed with a TCM 1800 curing unit across the entire working width immediately after paving. This prevents rapid evaporation and the formation of cracks.

For more information on companies in this article

Related Content

  • Millimetre accuracy for concrete paving
    July 30, 2019
    Concrete paving is now benefiting from the use of sophisticated machine control tools to deliver accuracy and high-quality surfaces Heavy use of concrete roads and runways over time will reveal any flaws in workmanship, the invasion of water, or the wear from use. Discolouration, scaling, crazing, cracking, or curling will sometimes occur due to a poor ready-mix batch, inadequate curing procedure, subgrade settlement, or improper bonding of the finish layer. Concrete surfaces are generally very durab
  • Compact paving solution from Ammann
    February 3, 2021
    Ammann’s compact paver has proven its worth for a German contractor
  • In the fast lane at Indian F1 track
    June 21, 2012
    India’s new Formula 1 motor racing circuit, with its tight construction tolerances, demands considerable driving skill. More than 500 million people worldwide watched the first Formula 1 motor race in India's history. The drivers were thrilled by the new asphalt circuit with its numerous bends and the peripheral area around the new race track at Greater Noida near the capital New Delhi, which were built by machinery from German company Vögele (a member of the Wirtgen Group). Working with four Super 1800-
  • Wirtgen introducing new concrete paver range
    March 3, 2015
    Wirtgen is introducing a new concrete paver range, the SP90 series. These models will replace the existing SP80 series as well as the SP850. Four basic models have been announced at present, the SP92, SP92i, SP94 and SP94i, although with the range of options and features available, the capabilities offered will be extensive. Paving widths for the machines now range from 2-9.5m, increasing the maximum width and allowing these units to handle a wider array of slipforming tasks than the earlier SP80 Series mod