Skip to main content

CONTROLS tackles fibre-reinforced concrete with new testing system

Fibre-reinforced concrete (FRC) has long been used for road pavements and is now a common material for civil engineering applications such as precast tunnel segments and sprayed concrete linings. However, testing FRC is challenging because the fibres – which are usually steel or macro-synthetic – rupture suddenly, causing the specimen to lose its bearing capacity. During this critical phase any sudden release of elastic energy by the frame of the testing machine may cause the premature rupture of the specim
July 19, 2017 Read time: 2 mins
Configuration of ADVANTEST controls system with flexural testing frame
Fibre-reinforced concrete (FRC) has long been used for road pavements and is now a common material for civil engineering applications such as precast tunnel segments and sprayed concrete linings.


However, testing FRC is challenging because the fibres – which are usually steel or macro-synthetic – rupture suddenly, causing the specimen to lose its bearing capacity. During this critical phase any sudden release of elastic energy by the frame of the testing machine may cause the premature rupture of the specimen and the consequent loss of the test results. For this reason, the International Standards require a minimum frame stiffness of 200 kN/mm.

2139 CONTROLS has recently added to its range of flexural testing frames with a new 200 kN capacity model especially designed to test FRC and sprayed concrete specimens, exceeding the Standards' stiffness requirements. The additional stiffness comes from the construction of the frame sections and the layout which keeps the specimen aligned with the frame crossbeams maximising structural rigidity. The new layout also allows easier frontal specimen loading and positioning, according to CONTROLS. It can accommodate large specimens such as slabs, flagstones, concrete beams and kerbs up to 650mm long. The frame is fitted with a high-accuracy load cell and can be provided with a LDT displacement transducer to read piston travel.

For more information on companies in this article

Related Content

  • Well structured maintenance
    January 4, 2013
    Major bridge maintenance and replacement projects across the world are extending the life of many impressive historic landmarks as Guy Woodford reports The Tamar Bridge, part of the main A38 trunk road linking Saltash in Cornwall with Plymouth in Devon, south west England, marked its 50th anniversary with a steel deck resurfacing project involving Stirling Lloyd's Eliminator bridge deck waterproofing system. Jointly owned by Plymouth City Council and Cornwall Council, the Tamar has a suspended length of 642
  • Korean bridge construction poses challenges
    April 5, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges The new Busan-Geoje crosses from South Korea's second city to its biggest island and is slightly shorter than the 12km of the country's famous Incheon project. In addition the main cable stay bridge for the Busan-Geoje project has a 475m span rather than the 800m of the Incheon central span. However the 8.2km Busan-Geoje project faces perhaps greater technical challenges and also includes a second b
  • Advances in asphalt testing
    August 31, 2012
    The latest asphalt testing equipment brought onto the market is both innovative and highly accurate as Kristina Smith reports Advanced pavement design requires advanced test equipment. And advanced test equipment takes time and money to design, engineer and produce. But if your expensive testing machine could perform a few more tricks, buying one would make financial sense to more organisations. This is the thinking behind IPC Global’s new Uniaxial Fatigue Test Kit for its Asphalt Performance Mixer Tes
  • Australian contractor’s stringless slipforming switch
    April 27, 2015
    An experienced contractor in Australia is benefiting from using stringless controls for slipforming work to boost efficiency. Set up times are shorter using the Topcon technology for stringless paving An Australian contractor is now benefiting from using stringless controls for slipforming work on its Power Curbers machine Statewide Kerbing of Sydney, New South Wales, has been an innovator with different types of slipforming work in Australia. And the firm has taken that one step ahead by using the